悬索桥牵引系统及猫道架设工程(国外英文资料).doc

悬索桥牵引系统及猫道架设工程(国外英文资料).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
悬索桥牵引系统及猫道架设工程(国外英文资料)

悬索桥牵引系统及猫道架设工程(国外英文资料) Suspension bridge traction system and cat road project Second, the overview Two, traction system The traction system is the power system of the main cable. Mainly undertake the work of cat road erection, cable traction, cable clamp and sling. According to the actual situation of the bridge project in wanzhou, it is decided to adopt the pull system of the frame type tractor. This system consists of two anchorage respectively set up in the south, north on, vice hoist, phi 36 pulling cable, phi 28 back to pull the rope and pulled, anchorage block and tackle door frame, the top of the tower door frame block and tackle, cat door frame and block and tackle, and on the top of drum. 2, cat, The cat lane is the construction road which is set up for the main line. The catwalks of the bridge over the two Bridges are set in the lower part of the two main cables. Each cat is divided into three segments: the south, the middle and the north. Each segment is made of eight parallel phi 48 wire mesh, beams, handrails, side nets and columns. The cats top layer is equipped with a cats wheel, a cats doorframe and phi 28. There are five pedestrian passageways between the upper and lower cat channels, one on each side. In the article 3. Because the width of the cat is small and the weight is light, there are two wind lines in the lower part of the cat, which are connected to the cat way through the sling. The determination of method of erection of traction system The development of traction system should strive for simple economy and minimize the use of channel. The usual method is to take the first line of the tracer cable and pull it across the river, using the lead cable to guide the rope through the air. Through extensive consultation and comparison of various erection methods, it is decided to adopt the towing phi 16 leading line from the south to the north across the river. Then the upstream side traction system is set up. The downstream traction system is se

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档