南昌出台修建工程计算规矩 临骨干道室庐阳台统一关闭(国外英文资料).doc

南昌出台修建工程计算规矩 临骨干道室庐阳台统一关闭(国外英文资料).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
南昌出台建筑工程计算规则 临主干道住宅阳台统一封闭(国外英文资料) Nanchang introduced the rules of the construction project to be closed in the main road residential area On the 14th, reporters learned from the planning department that the building area, volume rate and the building density calculation rule (revised) in the construction area of nanchang city have been in force since November. The height is less than 2.2 meters and the volume is divided by 1/2 Rules is put forward, the following points calculated on the construction area of calculation of construction engineering construction area and included in the plot ratio: the ground buildings (including building at the top of the staircase, elevator machine room, and the structure of retaining structure transformation layer, equipment, pipeline, the underlying garage, utility room, etc.) structure layer is in 2.2 meters and above is included in the plot ratio according to whole area; The structure height is less than 2.2m and the volume is accounted for by one-half area. The area of the basement, which is more than 1.5 meters high above the outdoor floor, is included in the building area. Ground floor elevation is inconsistent, outdoor floor 0.3 meters with surrounding city road elevation and computing (surrounding city road elevation, on the basis of city road of low elevation, except the elevation difference is greater than 3 m). At the same time, the second half of the business on the ground floor should be included in the volume rate. Other non-escape Spaces (such as stairwells, elevator Wells, and other functional units) of the supra-level construction site shall be included in the volume rate; In the basement of commercial, office, hotel and other public construction projects, the volume rate shall be included in the basement of the basement except for parking and equipment. The external insulation layer outside the building is not included in the volume rate Rules is put forward, the following points calculated on the construction ar

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档