- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
挡水围堰和抛石挤淤施工计划战争而安排(国外英文资料)
挡水围堰和抛石挤淤施工方案和平而布置(国外英文资料)
The construction plan of water retaining cofferdam and parabillite is arranged in peace
First, the general situation of the project
The blocks in the K6 + 280 ~ K6 + 500, + 760 ~ K6 K6 + 990 section of road embankment fall into the old port riverbed respectively, its size is differ, and K7 + 020 old dagang river across the road, and had a K7 + 020 left picture of 36 m and a horizontal drainage pipe culvert and roadbed along the road direction arrangement has a water tank, box culvert section size is 6.5 * 4.5 m2 and 6.4 * 4.4 m2. According to the design drawings and technical disclosure content and other related documents, the three river section, place inside all adopt the ripped-rock crowded silting scheme for construction, riprap engineering amount is about 40000 m3, which K6 + 280 ~ K6 + 510 section of about 15000 m3, K6 + 760 ~ + 990 section of K6 is about 15000 m3, K7 + 020 is about 10000 m3.
Second, construction deployment and method
Because the three segments, discontinuous, and stone, a lot of work, be using piecewise construction scheme of riprap crowded silting, namely the segmented closure, pumping water, stone, crowded silting.
First, the embankment of the old great harbor river, which is translocated in the area of K7 + 020, is handled by the embankment. On both ends of the first step, the closure, use of already built a good construction road south, as water retaining cofferdam, the north end of the road at the slope foot picture to do a water retaining cofferdam, location and section size see layout; Second, drain the water from the drain and drain the river. Third step, riprap crowded silting, stone, from south to north, along with the cast over crowded, silt crowded to near the north end of the water retaining cofferdam, the silt with drivers piled up in the river on both sides of the green belts. Because there are horizontal pipe culvert at K7 + 020, the south elevation of 34.2 m, the northern tip of 33.8 m, tossing the
您可能关注的文档
- 北京游——柳荫街(国外英文资料).doc
- 北京旅游攻略 4日具体行程(国外英文资料).doc
- 千岛湖旅游攻略(国外英文资料).doc
- 卒业功课二题目(2014春届)(国外英文资料).doc
- 化学需氧量常用测定方法的比拟(国外英文资料).doc
- 单梁吊挂起重机介绍(国外英文资料).doc
- 单片机抗干扰技能简介(国外英文资料).doc
- 南京路步行街的市场定位(国外英文资料).doc
- 南方文交所泉币邮票交易系统正式上线交易(国外英文资料).doc
- 剪力墙的安排方法(很好)(国外英文资料).doc
- 关于固定资产清查方案.docx
- 关于团员年度个人总结范例(22篇).docx
- 关于司机年终工作总结范文5篇.docx
- 2023年海南省定安县教育局公务员考试《行政职业能力测验》历年真题及详解.docx
- 关于卫生院工作总结(23篇).docx
- 2023年海南省儋州市政府办公务员考试《行政职业能力测验》历年真题及详解.docx
- 关于县民政局2024年民情走访活动工作方案.docx
- 2023年海南省三沙市信访局公务员考试《行政职业能力测验》历年真题及详解.docx
- 2023年海南省保亭黎族苗族自治县卫生健康局公务员考试《行政职业能力测验》历年真题及详解.docx
- 2023年海南省儋州市人力资源和社会保障局公务员考试《行政职业能力测验》历年真题及详解.docx
文档评论(0)