施工组织测验试卷2008(国外英文资料).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工组织测验试卷2008(国外英文资料)

施工组织考试试卷2008(国外英文资料) In this paper, by dannie831 contribution Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view. A. Fills up the topic (20 * 20 ` ` = 1) fills up the topic () 1. The rhythmic rhythmically flowing water construction refers to. The three to one flat for the job is to refer to:. The work must be done in six parts:,, and. Virtual work refers to a job that is both done and done. The beginning of a task is four and eight at the earliest, and the actual time is the beginning of the first day and the end of the first day. The length and length of the shaft of the network plan are related. A single substitute is enclosed in four basic copies of the network:,. 2. Select the topic (20 * 2 ` = 40 `) multiple choice (20 * 2 ` = 40 `) 1. The said method in construction project schedule, compared with the crossing project, the advantage of network planning is to (). A. clear logical relations between each work b. visual expression of construction schedule plan calculated period c. clear lap time between each work D. The duration of the visual representation of various work 2. Construction project organization construction, the water used to express the water construction in the state of the construction technology progress of several refs One is (). Section b. a. running water flow intensity of c. water beat d. water step 3. The construction project organization in construction of water, water interval between adjacent professional teams are equal, and no free time between the construction period is the (). A. beat the rhythm of running water and accelerate the construction of double water construction b. multiplying beat general water construction and the rhythm of running water c. fixed beat water construction and speed up the double water construction d. general double beat water construction and fixed water construction 4. A division of the project have 3 cons

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档