- 1、本文档共4页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水泵台数的选择及把持方法(国外英文资料)
水泵台数的选择及控制方式(国外英文资料)
Selection and control of pump stage number
1, principle: for not artificially controlled or artificial control of serious consequences will be produced after collecting well (fire water drainage, rainwater), should consider to set up the standby pump, other sump pump is generally not equipment. But all water Wells need to set the alarm water level of three kinds: stop pump water level, first (second, third...). Pump water level, overflow (spare pump pump) water level
Lead to the property management center.
2, for the rainwater collecting well, no matter for bike ramp, or ramp, all needs to set up a spare pump, and because of the rain return period of random, backup automatically when the pump should be in the water level alarm input, is like a water pump for dual-use preparation and above, should by Taiwan, close by.
Only two drainage pumps in the current specification of water pump house or fire water pump are the fire pump.
Because although the specification only requires 10L/s, the amount of water is much more than 10L/s when the fire is on fire, so the spare pump is required to start automatically when the alarm water level is in place.
4, basement, equipment room (such as living water pump room), such as shop floor washing waste water pump well, the standby pump does not need to start when water level alarm, if there is a set of two or more Wells, dont consider pump equipment, such as well to the rolls without the rest of the season, the collecting well combined drainage, fire fighting pump, pump well and control should be in accordance with the fire pump well consideration. In particular, the pump and control should be considered according to the fire collection well, especially for the waste well of the lower part of the basement, such as the pump room due to the laminar shortage.
To reduce the water pump discharge and increase the number of pumps, in order to satisfy the requirement of the maximum capacity of the collecting well and not
您可能关注的文档
- 椭球与投影(国外英文资料).doc
- 楚雄华宇商品凝土无限公司(国外英文资料).doc
- 楼梯计算及施工图要点(国外英文资料).doc
- 检测海水淡化装备进水压力及把持压力(国外英文资料).doc
- 楼面活荷载取值(国外英文资料).doc
- 概率、希冀与方差的计算和性质(国外英文资料).doc
- 概率习题解答4-4(国外英文资料).doc
- 概率考研数学三(国外英文资料).doc
- 榆林步行街(国外英文资料).doc
- 概率论第五章习题解答(国外英文资料).doc
- 5.3.1函数的单调性(教学课件)--高中数学人教A版(2019)选择性必修第二册.pptx
- 部编版道德与法治2024三年级上册 《科技提升国力》PPT课件.pptx
- 2.7.2 抛物线的几何性质(教学课件)-高中数学人教B版(2019)选择性必修第一册.pptx
- 人教部编统编版小学六年级上册道德与法治9 知法守法 依法维权(第一课时)课件.pptx
- 三年级上册品德道德与法治《学习伴我成长》.pptx
- 部编版小学道德与法治六年级上册6 人大代表为人民 课件.pptx
- 部编版小学道德与法治六年级上册1感受生活中的法律第一课时课件.pptx
- 2.5.2圆与圆的位置关系(教学课件)-高中数学人教A版(2019)选择性必修第一册.pptx
- 2.5.1直线与圆的位置关系-(教学课件)--高中数学人教A版(2019)选择性必修第一册.pptx
- 14.1.1 同底数幂的乘法(教学课件)-初中数学人教版八年级上册.pptx
最近下载
- 刘珉《国际贸易实务》第2版 课件 全套课件.pptx
- 健康服务与管理人才职业岗位能力需求调查研究-来源:中国高等医学教育(第2020011期)-浙江大学 全国高等医学教育学会.pdf VIP
- 某某医院整体搬迁实施的方案.doc
- GB50327-2001住宅装饰装修工程施工规范.docx
- 第2章 飞行事故中人的因素《飞行中人的因素》.pptx VIP
- 小学五年级上册科学教学:《摆的快慢》说课.docx
- 统编版语文六年级上册-13 桥-教学课件(多篇).pptx VIP
- DELI 得力AA186W条码扫描器说明书.pdf
- 统编版语文六年级上册13《桥》(教学课件).pptx
- 办公软件EXCEL技巧培训课件.pptx
文档评论(0)