- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
测风牌板及瓦斯排版吊挂(国外英文资料)
测风牌板及瓦斯排版悬挂(国外英文资料)
Driving: the gas card is located between 5 and 15 meters from the working surface. The wind is located about 20 meters away from the work surface
Return: the gas card is located at the inside of the back wind lane 20 meters from the work surface, the wind card is located in the distance of the face of the work face to the wind station
The fan check card is in front of the fan inlet.
Rules for the management of the signboard
In order to further enhance the management level, through the management responsibility clear, ensure the normal use of all kinds of general prevention facilities, enhance the effect of general prevention facilities for management, reduce the wastage of the general prevention facilities card board, according to the superior quality management standard prevention and general prevention facilities for management of the relevant provisions of village in the coal mine is established through the card board regulations are as follows:
A, all mine ventilation, dust prevention, monitoring facilities and other need for management of the prevention work, must be comprehensive practice for management, according to the work scope of area division of card board by each unit of suspension, clean, move move, recycling and so on daily management work, the work area and safety is responsible for the supervision and inspection and assessment.
2, all kinds of card board material, size, content must comply with the relevant quality standards and the superior, by the work area, tong lane team is responsible for making and issuing of card board.
Three, the requirement of management card board must be in accordance with the provisions for suspension, remain suspended solid, location, clean and beautiful, to avoid the car, where the water gun collapse and have a shower.
1, sealed management board hanging on the center of the closed wall, 1.5 meters high, before closing the fence, fence must pensile no admittance brand, the prevention work area enclo
您可能关注的文档
- 水泵PID操纵器应用仿单(国外英文资料).doc
- 水泵不出水的启事(国外英文资料).doc
- 水泵与水泵站功课(水利)(国外英文资料).doc
- 水泵倾销技巧请求(国外英文资料).doc
- 水泵卫生同意批件证实文件(国外英文资料).doc
- 水泵台数的选择及把持方法(国外英文资料).doc
- 水泥砼路面施工注意事项(国外英文资料).doc
- 水泵各部件考验标准(国外英文资料).doc
- 水泵基础常识讲座(国外英文资料).doc
- 水泵填料常识(国外英文资料).doc
- 2024届广东省深圳市坪山区中学山中学毕业升学考试模拟卷英语卷含答案.doc
- 2024届广东省肇庆市高要区金利镇朝阳教育集团达标名校中考英语对点突破模拟试卷含答案.doc
- 2024届广东省深圳市坪山新区中考英语模拟预测题含答案.doc
- 2024届广西钦州市东场中学中考英语模试卷含答案.doc
- 2024届广西南宁市第47中学中考英语最后冲刺浓缩精华卷含答案.doc
- 2024届广西南宁市兴宁区新兴校中考英语模拟精编试卷含答案.doc
- 2024届广东省陆丰市春源双语校中考联考英语试题含答案.doc
- 2024届广西平南县中考英语模试卷含答案.doc
- 2024届广东省深圳市桃源中学中考英语模拟精编试卷含答案.doc
- 2024届广西四市同城市级名校中考英语考试模拟冲刺卷含答案.doc
文档评论(0)