测风牌板及瓦斯排版吊挂(国外英文资料).doc

测风牌板及瓦斯排版吊挂(国外英文资料).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
测风牌板及瓦斯排版吊挂(国外英文资料)

测风牌板及瓦斯排版悬挂(国外英文资料) Driving: the gas card is located between 5 and 15 meters from the working surface. The wind is located about 20 meters away from the work surface Return: the gas card is located at the inside of the back wind lane 20 meters from the work surface, the wind card is located in the distance of the face of the work face to the wind station The fan check card is in front of the fan inlet. Rules for the management of the signboard In order to further enhance the management level, through the management responsibility clear, ensure the normal use of all kinds of general prevention facilities, enhance the effect of general prevention facilities for management, reduce the wastage of the general prevention facilities card board, according to the superior quality management standard prevention and general prevention facilities for management of the relevant provisions of village in the coal mine is established through the card board regulations are as follows: A, all mine ventilation, dust prevention, monitoring facilities and other need for management of the prevention work, must be comprehensive practice for management, according to the work scope of area division of card board by each unit of suspension, clean, move move, recycling and so on daily management work, the work area and safety is responsible for the supervision and inspection and assessment. 2, all kinds of card board material, size, content must comply with the relevant quality standards and the superior, by the work area, tong lane team is responsible for making and issuing of card board. Three, the requirement of management card board must be in accordance with the provisions for suspension, remain suspended solid, location, clean and beautiful, to avoid the car, where the water gun collapse and have a shower. 1, sealed management board hanging on the center of the closed wall, 1.5 meters high, before closing the fence, fence must pensile no admittance brand, the prevention work area enclo

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档