- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Council Report - Norwich Northern Distributor Route - 12 …
NORWICH NORTHERN DISTRIBUTOR ROUTE
Portfolio Holder(s): Cllr Iles Planning Policy and Conservation
Wards Affected: All; indirectly
SUMMARY
The Council has recently received copies of correspondence sent by the County Council to a number of residents in the area around Attlebridge, Moreton on the Hill and Weston Longville. This concerns the outcome of earlier consultations on potential routes for a Northern Distributor Road around Norwich. The correspondence is appended. It is largely self explanatory.
INTRODUCTION
2.1 Members will recall that there have been a number of consultations, most recently at the end of 2004, when a range of routes were suggested for the western most section of the road, crossing the Wensum Valley. These consisted of a green line route passing between Taverham and Drayton and then along the Tud valley through Costessy, an orange route which passed close to Taverham and connected with the Longwater junction of the Southern Bypass, passing through or adjacent to the proposed development north of the River Tud, a blue route which passed through Ringland Hills, a red route which passed to the west of Ringland village and two routes which were designed to avoid a new crossing of the Wensum, and which relied upon the existing crossing at Attlebridge. This would have required widening to deal with a dual carriageway route. The routes in question passed to the east of Weston Longville village and the former airfield before separating, the brown route to rejoin the A47 close to the Easton Bypass and the purple route, avoiding a crossing of the River Tud joining the A47 near Honingham. The District Council’s view at that time was that it preferred the orange route but would not object to the red route – it would, however, object to the other alignments.
OUTCOME OF THE CONSULTATION
The County Council considered the results of the further consultation outlined above on possible routes for the Northern Distributor Road in March 2005. Particular
您可能关注的文档
最近下载
- 石油化工紧急冲淋系统设计规范 SHT 3205-2019.pdf
- 现代企业管理信息系统实践考核真题精髓版.pdf
- 课件中国成人心肌炎临床诊断与治疗指南-2024.pptx VIP
- 《微机原理与接口技术》(徐建平)785-2课件 第9章.pptx VIP
- 原始点医学手册文字版.pdf
- 2024年开封文化艺术职业学院单招综合素质考试试题及答案解析.docx
- ANSI-AWS D1.1-D1.1M 2010 美国钢结构焊接规范 中文版.pdf
- 中医病证诊断疗效标准.pdf VIP
- -高三英语公开课(试卷讲评课)省公开课获奖课件市赛课比赛一等奖课件.pptx
- 2024年青海省西宁市中考道德与法治试题卷(含答案).docx
文档评论(0)