- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
尼日利亚科吉州依托巴火电站项目
项目概况
尼日利亚科吉州依托巴火电站项目业主为Zuma Energy Nigeria Limited。火电站包括8台机组,单机容量为150MW,总装机容量1200MW,分二期开发,计划开工后第36月第一台机组发电。项目采用EPC总承包模式实施,承包人负责火电站勘察设计、设备采购、施工安装及调试等工作。目前我公司已与保利科技组成联营体参与该项目。主要包括以下工作内容:
1. The Power Plant: It will include delivery and erection of turbines,boilers, balance of plants and auxiliaries, etc. in addition to civil works,erection of control room, testing and commissioning.
2. Power Evacuation: A double circuit 330 kV transmission line will be
constructed to connect the power plant to the National Grid at
Ajaokuta-Lokoja-Gwagwalada 330 kV DC line, a distance of 25 km to
the tie-in point.
3. Roads Upgrade for coal transport from mine site to power plant
location: Owing to the very large quantity of coal that will need to be
transported over a distance of between 85km – 90km from the coal
mine at Okobo to the power plant at Itobe, it is proposed that road
upgrades be made to enable the use of 60 Ton trucks. Zuma Energy
to obtain all necessary permits from the relevant authorities and right
of way if any.
4. Roads Upgrade for limestone transport from quarry to Power
plant site: Limestone will need to be transported via trucks a distance
of about 150km from the quarry site at Ekerin-Adde to the power plant
location at Itobe. Zuma Energy to obtain all necessary permits from
the relevant authorities and right of way if any.
5. Fuel Transportation and Storage: Fuel storage/ tank farm will need
to be built for diesel storage.
6. Jetty Construction: A multipurpose Jetty will be constructed for
delivery of equipment, coal and other fuels and goods to site.
7 Residential area for construction workers and power plant
personnel: During construction, about 400 workers will be on site in
peak periods. The estate will house construction workers and later
serve as residence for power plant operators and administrative staff.
8 Relocation of Local Community: It is necessary to relocate a
number of local residents at the Ite village close to the proposed
power p