- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电子厂客户稽核改善报告范本PPT
Confidential ISSUES FOR NOKIA AUDIT BUILD PROTECTED TRANSPORTATION ROUTES BETWEEN THE FACTORIES 1. Background and Objective Importance to build ASAP protected transportation routes between the factories is emphasized.Now there is a potential risk for damage on WIP. logistics Analysis of the current logistics in factory A1 A3 A2 A6 Air compressor station A5 Buffer Entrance 2.Analysis of the current A2 or A3/A6 carriage method. Key message: 1. Use W carriers to move the WIP now, 300pnl(250kg) each time; 2.In order to prevent products from falling and rain ,We use the PE film to wrap products and W carriers. 3. The model has no protection of temperature and humidity,seriously be affected by vibration,and has a potential risk for damage on WIP. Key message: The W wheel will use twice elevator in handling process,and the height of 4 factories is different with each other,the safety is not good;In the process of load and unload W wheel,There is a high scratch risk for damage on WIP. ? ? ? ? 3. Handling model A model ? Air piazza elevator Handling model B model Key message: Use the improved W wheel which decrease vibration effectively and wear-resistant move the WIP between the factories. Current-Light Load:85KG Improvement-Heavy duty W wheel Load:100KG Less vibration No protection of temperature and humidity Handling model C model C model use truck carrier to move the WIP between the factories, use the rear board which power is hydraulic pressure in order to push or pull the carrier conveniently,and we will redesign the protected products lay out in carrier. Low efficiency; Heavy cost Handling model D model D model:First, lay the L rack on the special pallet, then we move the special pallet from A2 plant to A3/A6 plant with forklift. Effectively protect WIP from demage of tempreture and humidity Avoid vibration. Fulfill requirement of quality. A2-A3/A6,about 200m,deliver about 2min. Sealed completely, thermal insulation material inne
文档评论(0)