盾构施工技术-14.doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
盾构施工技术-14

Zhongwu Gas Pipeline Yichang Honghuatao Changjiang Tunneling Shield Construction Technology (065000) China Oil Pipeline Bureau No.4 Engineering Corporation Gao Jianguo Abstract This article introduces silo construction, annulus production, operating principle of AVN2440 turbid water balance shield, and shield construction technology under geologic condition of mudstone and pebble in Yichang Changjiang tunneling project. Keywords: Changjiang tunnel, slurry balance shield, mudstone and pebble geology, shield construction technology 1. General situation of Yichang Changjiang tunneling project Yichang Changjiang tunnel is one of Zhong-Wu gas pipeline control projects, located within Yichang City Honghuatao- Yunchi River section, and 4Km away from Honghuatao Town. The tunnel is 1400m long, with internal diameter Φ 2440mm. Project including: launch shaft, arrival shaft construction; 1400 annulus (6 pieces every annulus); Shield tunnel 1400m. Main geologic features of the tunnel: 0-900m mainly for clay siltstone; 900-1400m mainly for high permeability pebble bed. Geologic description see fig. 1. Fig. 1: Geologic description of Yichang Changjiang tunneling project 2. Silo construction technology Silo project includes launch shaft, arrival shaft and other ancillary silo works. Silo consists of surface casing shaft and drop shaft, surface casing shaft is 7.06m deep, outside diameter 11.5m, internal diameter 10.3m; drop shaft is outside diameter 8.7m, internal diameter 7.5m; launch shaft is 48.4m deep and arrival shaft is 22.4m deep. According to geologic condition, launch shaft adopts drop shaft and drilling process; Arrival shaft adopts drop shaft process. Silo process flow 2.1.1 Silo construction process mainly includes: Surface casing shaft making and installation Silo making and installation Silo sinkage Silo subseal 2.1.2 Silo process chart Survey positioning- payingoff install casing shaft shoe casing shaft concreting Erect casing shaft formwor

文档评论(0)

zhuliyan1314 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档