2015监理房屋建筑工程延续注册考试题(国外英文资料).doc

2015监理房屋建筑工程延续注册考试题(国外英文资料).doc

  1. 1、本文档共36页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2015监理房屋建筑工程延续注册考试题(国外英文资料)

2015监理房屋建筑工程延续注册考试题(国外英文资料) 1. the RadioButtonList [type 60 questions] The plate gap width of 1. marble surface layer and the surface layer of granite paved tolerance (mm) A.2 B.3 C.1 D.5 About 2. demonstration review of hazardous project organized a group of experts say the error is () A. group of experts should be no less than 5 people B. expert group shall make written appraisal review report on the safety special construction plan C. construction enterprise should be perfected according to the appraisal review report, the technology of construction enterprises responsible person signed, shall be carried out D. written appraisal review report should serve as the safety special construction plan annex Not using the 3. reinforced masonry construction in winter (construction) A. admixture B. mortar mixed with salt method C. lookum D. freezing method (4.) the following business does not belong to the special inspection. The bearing capacity of A. pile test B. simple soil test C. silicone rubber structure compatibility testing The detection of D. concrete and mortar field The temperature is greater than 5. in the operation of emergency lighting (lighting) when near combustible, heat insulation, heat and other fire prevention measures taken A.50 C B.55 C C.60 C D.65 C 6. through the comprehensive quality control of the whole construction process, to ensure the construction quality standard delivery to meet the construction and design documents stipulated in the contract, the quality control target belongs to (). A. construction unit B. design unit C. construction unit D. supervision unit 7. in high formwork support reinforcement, in order to ensure the overall stability of the bracket, the bracket on the horizontal and vertical are provided with scissors, scissors erection ensure the tilt angle of the diagonal rod and ground in between. A.40? -60? B.45? -50? C.50? -60? D.45? -60? 8. according to the current management system, housing construction and municipal infrastr

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档