CFG长螺旋钻机的技术工法实践(国外英文资料).doc

CFG长螺旋钻机的技术工法实践(国外英文资料).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
CFG长螺旋钻机的技术工法实践(国外英文资料)

CFG长螺旋钻机的技术工法实践(国外英文资料) Technical engineering practice of CFG long spiral drill Geological measure things: (1) basal hold power for the sand dust (5) layer (partial clayey silt, silty clay layer 6), the standard value of subgrade bearing capacity is 220 kpa. (2) of CFG pile preset requirement: CFG pile composite foundation with borehole pressure irrigation plain cement column for discussion in recent years saw fit and using a new type of foundation disposal scheme, the way of construction is simple, fast, quality easy to stem. This technique was considered appropriate in a project, and it was satisfactory to use this technique for the first time in a project with a total height of over 100 megabytes. One may, engineering A project total construction plane or on the surface of the object size is about 230000 m2, is composed of four high-grade tower involving foreign apartment, that end in 1 # floor has started In construction, now the 2 # floor construction, total 2 # floor building 62089 was flat or the size of the object surface, three layer underground, the ground layer. The main structure of the main building is a box-shaped foundation, and the main structure type is the structure of the cast-cutting wall. 2 # building project total height 102 m, the default of 0.00 mm is fully elevation of 38.5 m, basal elevation of 15.86 m, 16.36 m, 15.56 m, goodbye to equal to the total height of 22.64 m, 22.14 m, 21.94 m. The final settlement of the main building is less than 80mm. The maximum total height of the brand is 0.8 per thousand; Dont think about the problems in the basement. The foundation bearing capacity is greater than 615 kpa. Preset depending on a parameter (a) henan sanli mechanical CFG pile, pile number 988 uniform root pile length 11.5 m uniform diameter 420 mm level such as cement C20 single pile bearing capacity of pile spacing standard 750 kn 1.29 x 1.30 m x 1.36 m x 1.42 m 1.36 1.39 150 mm thick layer sand mattress mattress layer (2) of CFG pile compos

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档