- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
CFG长螺旋钻机的技术工法实践(国外英文资料)
CFG长螺旋钻机的技术工法实践(国外英文资料) Technical engineering practice of CFG long spiral drill Geological measure things: (1) basal hold power for the sand dust (5) layer (partial clayey silt, silty clay layer 6), the standard value of subgrade bearing capacity is 220 kpa. (2) of CFG pile preset requirement: CFG pile composite foundation with borehole pressure irrigation plain cement column for discussion in recent years saw fit and using a new type of foundation disposal scheme, the way of construction is simple, fast, quality easy to stem. This technique was considered appropriate in a project, and it was satisfactory to use this technique for the first time in a project with a total height of over 100 megabytes. One may, engineering A project total construction plane or on the surface of the object size is about 230000 m2, is composed of four high-grade tower involving foreign apartment, that end in 1 # floor has started In construction, now the 2 # floor construction, total 2 # floor building 62089 was flat or the size of the object surface, three layer underground, the ground layer. The main structure of the main building is a box-shaped foundation, and the main structure type is the structure of the cast-cutting wall. 2 # building project total height 102 m, the default of 0.00 mm is fully elevation of 38.5 m, basal elevation of 15.86 m, 16.36 m, 15.56 m, goodbye to equal to the total height of 22.64 m, 22.14 m, 21.94 m. The final settlement of the main building is less than 80mm. The maximum total height of the brand is 0.8 per thousand; Dont think about the problems in the basement. The foundation bearing capacity is greater than 615 kpa. Preset depending on a parameter (a) henan sanli mechanical CFG pile, pile number 988 uniform root pile length 11.5 m uniform diameter 420 mm level such as cement C20 single pile bearing capacity of pile spacing standard 750 kn 1.29 x 1.30 m x 1.36 m x 1.42 m 1.36 1.39 150 mm thick layer sand mattress mattress layer (2) of CFG pile compos
您可能关注的文档
最近下载
- 151页-【低空经济】低空无人机公共测试场与验证基地设计方案.pdf
- 理想 RISO 9050 7050 3050 7010 3010 闪彩印王中文技术维修手册 后面可以参考理想闪彩印王 EX7200 EX9050 EX9000 EX7250 系列中文维修手册 .pdf VIP
- 生物酶解技术.pptx VIP
- “素养导向”初中物理大单元教学策略及案例.docx VIP
- 小学四年级综合实践活动《衣服巧收纳》公开课课件.pptx VIP
- 公司建设项目全过程造价咨询工作规范.doc VIP
- 教学进度计划表.pdf VIP
- 直肠癌放射治疗靶区勾画.ppt
- 软件工程项目造价技术规范.pdf VIP
- 2025年左玉辉-环境学.pptx VIP
文档评论(0)