- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
D10R型推土机变速系统故障的排查(国外英文资料)
D10R型推土机变速系统故障的排查(国外英文资料)
Troubleshooting of D10R bulldozer transmission system
2009-4-2
(1) could not walk
Equipment management, equipment maintenance, detection and diagnosis of N6t China equipment management network OHX
A D10R type bulldozer can not walk, the dashboard shows DIRLVROUT
Equipment management, equipment maintenance, detection and diagnosis of N6t China equipment management network OHX
CAL , namely the direction rod beyond the calibration range. The steering rod sensor is non-contact, the possibility of damage is very small, probably because of the long-term use of PWM sensor output signal changes, resulting in the drive controller can not be interpreted. Carter ET maintenance software online, FNR use the rod correction function for correction, fault code disappears, the machine back to normal. D10R bulldozer cab touch console also provides FNR direction pole correction function, the system can also complete the correction, faster.
Equipment management, equipment maintenance, detection and diagnosis of N6t China equipment management network OHX
(2) ascending switch fault
Equipment management, equipment maintenance, detection and diagnosis of N6t China equipment management network OHX
A new type of D10R bulldozer is normal, but the dashboard display UPSHTSW
Equipment management, equipment maintenance, detection and diagnosis of N6t China equipment management network OHX
ERR, namely up switch error. Shift operation of bulldozer is very frequently, up press the switch number, the right to switch is damaged. After inspection, the normal line, switch up part of the damage. After testing, the upshift in the switch normally open contact is normal, but normally closed contacts open, so the shift operation is normal, but the fault code. Because of the temporary absence of spare parts, and import parts procurement is very slow, so consider alternative methods. In the relay open contact and a normally closed contact of a pair of ordinary, just can substitute bl
您可能关注的文档
- 300首好听的粤语歌(国外英文资料).doc
- 30天30队2010-11季,关注丹佛掘金的10个理由(国外英文资料).doc
- 22种宝宝辅食做法(国外英文资料).doc
- 36种方法教出优秀小孩(国外英文资料).doc
- 39-一、框图、流程型推断题 06年各区一模推断题(国外英文资料).doc
- 37wan英雄神殿攻略(国外英文资料).doc
- 3d 英汉对照(国外英文资料).doc
- 3D MAX命令翻译(国外英文资料).doc
- 34个植物提取物产品的生产工艺流程(国外英文资料).doc
- 3D MAX简介与快捷键(国外英文资料).doc
- 2024年证券分析与咨询服务项目投资申请报告代可行性研究报告.docx
- 2024年铬酸酐项目资金申请报告代可行性研究报告.docx
- 2024年清洁胶项目资金申请报告代可行性研究报告.docx
- 2024年肉松饼项目投资申请报告代可行性研究报告.docx
- 2024年陆上泵项目资金需求报告代可行性研究报告.docx
- 2024年未硫化复合橡胶及其制品项目资金需求报告代可行性研究报告.docx
- 2024年精密温控节能设备项目资金筹措计划书代可行性研究报告.docx
- 2024年汽车覆盖件模具项目资金筹措计划书代可行性研究报告.docx
- 宋词行书钢笔字帖.pdf
- 我的暑假生活作文三年级300字10篇.pdf
文档评论(0)