HIS项目失败的10大原因及对策(国外英文资料).doc

HIS项目失败的10大原因及对策(国外英文资料).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
HIS项目失败的10大原因及对策(国外英文资料)

HIS项目失败的10大原因及对策(国外英文资料) 10 Reasons and Countermeasures of HIS project failure First, the project failed. High, big and empty is a notable feature of the project failed. Some hospitals without objective analysis, such as market conditions, the current domestic status of the development of HIS, the hospitals financial situation, human resources, awareness, computer basic level, hospital process specification level, the urgent need to change the intensity and so on, a project must be built based on lofty, digital hospital, and is a set of system coverage every corner of the hospital, the other is the project report is very vague, a simple analysis of the point to list some on-line system modules, and finally make a line on schedule, a large HIS system project project will be accomplished. The project from the beginning to an ideal thinking to operate, there will be a large number of subsequent projects to the foreseeable difficulties, how to ensure the success of the project? The project is the HIS project master, master is not clear, the goal is not clear, the goal should not be too advanced to meet the current demand of the HIS function, there is no need to build content of the future 10 years, dozens of years are included in a project, if only when the hospital in order to solve the charges the problem is, only in the financial center for the HIS project. Further investigations should be investigated, or just hearsay some hospitals, it is difficult to determine what should own hospital construction to what level, this stage can refer to two methods, one is invite professional consulting company or the province hospital expert team for the specific situation, make an appropriate plan for the construction of HIS, the two step is to but, not ambitious, only to build their own and the most mature HIS products, so we can ensure the success of HIS project from the beginning. Two, the selection of failure. Software as his wife, this is the common aspiration of many HIS pr

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档