中国石油北京《修井工程》第三阶段在线作业(国外英文资料).doc

中国石油北京《修井工程》第三阶段在线作业(国外英文资料).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国石油北京《修井工程》第三阶段在线作业(国外英文资料)

中国石油北京《修井工程》第三阶段在线作业(国外英文资料) Online oil Beijing - third stage 14 spring 13 spring autumn 13 operation in China University of Petroleum Single choice A first questions the following process does not belong to the reconfiguration and adjustment operation? A, sand B, baekwashing C, tubing D, wellhead lift Second questions in heavy with the preparatory work, how long should advance notice well shut in pressure units? A, 12h B, 36h C, 24h D, 48H The following third questions in the process does not belong to the pump inspection construction is? A, construction preparation B, wash well C, wells D, wells Fourth the following options do not belong to the test with the construction step a is? A, the pipe column requirements B, sand C, baekwashing D, wells The investigation content does not belong to the fifth question is the following options? A, on the sand surface B, sand C, baekwashing D, check the quality of perforating Sixth collecting flow measuring and adjusting the ground connection from the bottom to the top? A, test seal - universal joint - turbine flowmeter and rod - rope fishing head cap B, testing seal section - turbine flowmeter - rod - universal joint - rope fishing head cap C, testing seal section - turbine flowmeter - universal joint - rod - rope fishing head cap D, testing seal section - turbine flowmeter - rope cap - fishing head gimbal - rod Seventh non packer test, non packer flowmeter will be down to the next level of bridge eccentric water regulator above what position, how long and hovering in the tubing? A, 3-5M, 1-3min B, 1-3m, 3-5min C, 1-3m, 1-3min D, 3-5M, 3-5min Which consists of eighth questions water injection pipe string structure including? A, Y341 packer, bridge eccentric water regulator, hydraulic circulating valve B, Y341 packer, bridge eccentric water regulator, water blocking device C, Y341 packer, water blocking device, hydraulic circulating valve D, Y341 packer, bridge eccentric water regulator, water blocking device, hydraulic circul

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档