- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
主要人员设备进场计划及保证措施(国外英文资料)
主要人员设备进场计划及保证措施(国外英文资料) The new key personnel, equipment mobilization plan and security measures, a project of Yun Gui railway hub of the Nanning Railway Station east from Nanning along both the Nanning Kunming railway corridor after the introduction of both the BaiSe Railway Station. After the line west across Youjiang into the territory of Yunnan province after Wenshan, Funing County, Guangnan county and Maitreya River Street in Qiubei County near the cross Nanpanjiang Honghe Maitreya County into the Kunming Shilin County in the south side of Yiliang again after the Vietnam cross Panjiang Yangzong town in the East after the Kunming New District of Chenggong City, KunMing South Railway Station line into Kunming. Hub. The new cloud GUI railway line length of 709.518 km of which 431.183 km Yunnan province. The tenders for the project six standard DK598340DK651230 station is 52.4 kilometers length of main engineering tunnel 9 31978 meters 16 bridges including large bridge 7 bridge 5 6531.979 meters 1405.121 meters in 1 seat 109.938 meters bridge 3 meters a total of 8108.218 meters 61.18 extended culvert 35 a total of 1674.94 horizontal meter track engineering the ballastless track is 33.28 km long track is 19.12 km long and other information communication and signal operation of production equipment and building large temporary facilities and transition project etc.. Two, personnel and equipment entering the situation as of September 10th I General Staff of 974 people entering the main management staff of 287 people, including 40 people project manager project division, a total of 247 people and 667 construction workers. Mechanical equipment to 233 sets of 24 excavators, 29 loaders, 4 bulldozers, rollers 2, mixing machine 11 sets, 3 sets of crane, concrete 7 transport vehicles, 11 sets of wet spraying machine etc.. Three, the main program of project manager department personnel arrived at the scene at present the main management personnel have all arrived at the scene
您可能关注的文档
最近下载
- 300MW汽轮机停机后偏心大的原因及处理.pdf VIP
- 行政前台岗位职责.doc VIP
- 合肥新站区佳海工业城标准化厂房运营服务简介.ppt VIP
- T_AHSX 15-2024 饲料原料 酿酒酵母培养物.pdf
- 实用英语教学法教程教学课件-Chapter 6 Classroom management.ppt VIP
- 2024年吉安市遂川县招聘城市社区专职网格员考试真题.docx VIP
- 安全员B证考试练习测试卷.docx
- 《国际学术论文写作与发表》完整版答案.docx VIP
- 《埋地钢质管道防腐保温层技术标准》.pdf VIP
- 2025山西晋城市市政公用集团有限责任公司员工招聘76人笔试上岸历年真考点题库附带答案详解.doc
文档评论(0)