主要人员设备进场计划及保证措施(国外英文资料).doc

主要人员设备进场计划及保证措施(国外英文资料).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
主要人员设备进场计划及保证措施(国外英文资料)

主要人员设备进场计划及保证措施(国外英文资料) The new key personnel, equipment mobilization plan and security measures, a project of Yun Gui railway hub of the Nanning Railway Station east from Nanning along both the Nanning Kunming railway corridor after the introduction of both the BaiSe Railway Station. After the line west across Youjiang into the territory of Yunnan province after Wenshan, Funing County, Guangnan county and Maitreya River Street in Qiubei County near the cross Nanpanjiang Honghe Maitreya County into the Kunming Shilin County in the south side of Yiliang again after the Vietnam cross Panjiang Yangzong town in the East after the Kunming New District of Chenggong City, KunMing South Railway Station line into Kunming. Hub. The new cloud GUI railway line length of 709.518 km of which 431.183 km Yunnan province. The tenders for the project six standard DK598340DK651230 station is 52.4 kilometers length of main engineering tunnel 9 31978 meters 16 bridges including large bridge 7 bridge 5 6531.979 meters 1405.121 meters in 1 seat 109.938 meters bridge 3 meters a total of 8108.218 meters 61.18 extended culvert 35 a total of 1674.94 horizontal meter track engineering the ballastless track is 33.28 km long track is 19.12 km long and other information communication and signal operation of production equipment and building large temporary facilities and transition project etc.. Two, personnel and equipment entering the situation as of September 10th I General Staff of 974 people entering the main management staff of 287 people, including 40 people project manager project division, a total of 247 people and 667 construction workers. Mechanical equipment to 233 sets of 24 excavators, 29 loaders, 4 bulldozers, rollers 2, mixing machine 11 sets, 3 sets of crane, concrete 7 transport vehicles, 11 sets of wet spraying machine etc.. Three, the main program of project manager department personnel arrived at the scene at present the main management personnel have all arrived at the scene

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档