- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土建(国外英文资料)
土建(国外英文资料)
Complete set of calculation rules for civil engineering and hydropower
1. Leveling the site: excavation, filling, transportation and leveling of building site thickness below + 30cm. 1. Calculation rules of leveling site (1) list rules: according to the design drawing size, the first floor area of the building is calculated. (2) quota rule: according to the design drawing size, the outer edge of the outer wall of the building is added 2 meters per side, and the square area is calculated. 2, land leveling and calculation formula of S= (A+4) * (B+4) =S +2L +16 base type: S - leveling project; A -- building exterior line length length - width direction; B building exterior line length; S bottom - the bottom of the building construction area; L - building exterior line perimeter. The formula is applicable to the calculation of site leveling of any building or structure consisting of rectangular elements. Two, the basic earthwork excavation calculation, excavation earthwork calculation rules (1), list rules: dig foundation earthwork, according to the design drawing size, with the base cushion area to take the excavation depth calculation. (2) quota rule: the volume of earthwork excavated by manual or mechanical excavation shall be calculated by the depth of the bottom of the trough multiplied by the excavation depth. The bottom area of the trough shall be multiplied by the length of the bottom of the trough, the width at the bottom of the trough, the length and width of the bottom of the trough, the width of the base and the outer processing surface. When the slope needs to be put, the earthwork of the slope shall be combined into the total earthwork. 2. Excavation earthwork calculation formula: (1) calculation of excavation earthwork volume: Earthwork Volume = dig earthwork bottom area * excavation depth. (2), quota rules: trench excavation: V= (A+2C+K * H) H * L. Type: V - ditch earthwork; A -- C -- the bottom of the groove width; working face width; H - L -
您可能关注的文档
最近下载
- 《大学之道》《人皆有不忍人之心》(成语识记+挖空特训+情境默写+写作素材) 统编新教材高考语文课内古诗文【要点梳理与素材积累】.docx VIP
- 五年级道德与法治3,主动拒绝烟酒与毒品优秀教案.pdf
- 《美丽的丝巾ppt课件》小学美术浙人美版二年级下册_2.ppt
- 《论语十二章》(成语识记+挖空特训+情境默写+写作素材) 统编新教材高考语文课内古诗文【要点梳理与素材积累】.docx VIP
- 电动单梁起重机设计计算书.doc
- 2069-3-3101-002 WKB产品判定准则-外发.docx
- 露天矿组织架构、部门职责.pdf VIP
- 《数字化测图》课程标准(高职).docx
- 医疗行业医疗设备采购方案.docx VIP
- 朝阳市第四高中诗词大会十二宫格题.ppt
文档评论(0)