土建地基与基础施工工艺-下(国外英文资料).doc

土建地基与基础施工工艺-下(国外英文资料).doc

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土建地基与基础施工工艺-下(国外英文资料)

土建地基与基础施工工艺-下(国外英文资料) 3.11 during the winter, when the pile is difficult in frozen soil area, the frozen soil should be excavated or thawed. quality standard 4.1 ensure the project: 4.1.1 reinforced concrete precast pile quality must comply with the design requirements and construction specifications, and have the factory certificate. The elevation or penetration of the 4.1.2 pile and the joint treatment of the pile must comply with the design requirements and construction specifications. 4.2 allow deviation items, see table 2-5. Allowable deviation of reinforced concrete precast piles table 2-5 The allowable deviation of sub project (mm) test method The center line of the vertical base beam is 100 Along the center line of the base beam, 150 The number of 2 piles is 1~3 or single row piles 100 The number of 3 piles is 4~16 d/3 Edge pile d/3 Intermediate pile d/2 Note: D is the diameter of the pile or the length of the section. Finished product protection 5.1 piles shall reach 70% of the design strength and shall be lifted up to 100% to transport. When lifting and transporting 5.2 piles, the hanging points shall be in accordance with the design requirements and shall be stable and shall not be damaged. The stacking of 5.3 piles shall meet the following requirements: 5.3.1 the site shall be level and firm and shall not cause uneven subsidence. 5.3.2 the position of the wooden mat and the crane shall be the same and shall be kept in the same plane. The piles of the same pile number of the 5.3.3 shall be piled together, while the pile tip shall be at one end. 5.3.4 multi cushion wood should be aligned up and down, and the bottom wood should be widened properly. Stacking layer generally should not exceed 4 layers. 5.4 properly protect the axis and elevation of the pile foundation and control the pile. Not displacement due to impact and vibration. 5.5 if the geological data is not in conformity with the data provided during the piling, the construction shall be stopped an

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档