土方开挖技术交底(国外英文资料).doc

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土方开挖技术交底(国外英文资料)

土方开挖技术交底(国外英文资料) Technical disclosure record Specific date Project name Zheng Dong, new zone, Tube City, village resettlement area, two phase, three group, 6# building, sub project Foundation and foundation engineering Sub item name: Earthwork excavation works Disclosure content I. construction preparation: 1, the main equipment: sharp, flat shovel, hammer, trolleys, ladders, picks, crowbar, ruler, slope ruler, small line No. 20 wire etc.. 2, operating conditions: (1) before earthwork excavation, (2) the obstructions such as underground pipelines should be found out. (3) the ground and underground obstructions in the construction area shall be removed and disposed of according to the requirements of the construction scheme (4). (5) the position or location of buildings or structures of the control line (pile), (6) (7) standard size quasi level pile and foundation gray line, (8) must be tested qualified and finished pre screening procedures (9). (10) the surface of the site should be cleaned and leveled; (11) good drainage slope; (12) in the construction area, (13) temporary drains should be dug. (14) during the night construction, (15) the work procedure should be reasonably arranged; (16) to prevent excavation or excavation. The construction site shall be equipped with lighting facilities according to the requirements. (17) in danger areas, an obvious marker (18) shall be installed. (19) the excavation is below the ground level (tank) trench, (20) on the basis of local engineering geological data, (21) to take measures to reduce the groundwater level, (22) to fall below the bottom surface of the 50cm excavation, and then excavation (23). (24) familiar with drawings, (25) do a good job of technical disclosure. Two, operation process: 1, process flow: Determine the excavation sequence and slope, cut along the ash line, groove contour line, layered excavation Trimming the bottom of the trough 2, determine the slope: (1) when excavating the foundation pit (groove) and

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档