土木工程施工练习题(国外英文资料)
土木工程施工练习题(国外英文资料)
I. earthwork and stonework
2, the precipitation depth of jet well point is up to (8-20m).
32, when the permeability coefficient of soil is 5m/d and the requirement of precipitation depth was 5 m, the most suitable well point precipitation method is ().
55. The methods of filling compaction mainly include vibrating compaction method and vibrating compaction method.
59. The construction process of anchor bolt includes earthwork excavation, location, drilling, placing rod, grouting, tensioning and anchoring.
64, the construction process of soil nailing is divided into positioning, drilling, location, safety, surface reinforcement, shotcrete and surface layer.
62. The methods of sand prevention include digging method, excavation in low water season and underground continuous wall method.
93, the main factors affecting compacting quality of backfill are compaction work.
94, when the pit dewatering method is adopted, the sand flow phenomenon is easy to occur for fine sand and soil layer.
6, what are the basic principles of earthwork allocation?
13. Briefly describe the factors that should be considered in determining the level of site formation and design
21, some of the main measures to prevent the formation of well point precipitation harm neighboring buildings
23. Brief description of concrete measures for prevention and control of quicksand
32. Brief description of the basic requirements of earthwork filling
Two. Basic works
13, reinforced concrete precast pile using hammer method, when piling, piling should be ().
35, when the precast pile starts piling, its concrete strength should reach the design strength.
42, precast concrete pile precast site, the stack shall generally not exceed the number of layers.
48. In order to make mud play a role in the construction of mud protection bored pile, the liquid level in the hole should be kept higher than the water level.
56, the common methods of foundation pit support include cement wall support, undergrou
您可能关注的文档
最近下载
- 《大学之道》《人皆有不忍人之心》(成语识记+挖空特训+情境默写+写作素材) 统编新教材高考语文课内古诗文【要点梳理与素材积累】.docx VIP
- 五年级道德与法治3,主动拒绝烟酒与毒品优秀教案.pdf
- 《美丽的丝巾ppt课件》小学美术浙人美版二年级下册_2.ppt
- 《论语十二章》(成语识记+挖空特训+情境默写+写作素材) 统编新教材高考语文课内古诗文【要点梳理与素材积累】.docx VIP
- 电动单梁起重机设计计算书.doc
- 2069-3-3101-002 WKB产品判定准则-外发.docx
- 露天矿组织架构、部门职责.pdf VIP
- 《数字化测图》课程标准(高职).docx
- 医疗行业医疗设备采购方案.docx VIP
- 朝阳市第四高中诗词大会十二宫格题.ppt
文档评论(0)