工程监理细则(国外英文资料).doc

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程监理细则(国外英文资料)

工程监理细则(国外英文资料) Detailed rules for the supervision of water supply and drainage Outdoor water supply engineering Check the quality certificate of various pipes and valves to ensure that unqualified materials and equipment are not allowed to enter the scene. 2) the coordinate and elevation of the water pipes should comply with the design requirements, and the coordinate allows the deviation to be no greater than 50mm, and the elevation tolerance should not be greater than 30mm. The grooves of the water pipes, the height of the trough, the width, the width and the slope should meet the design requirements. Welding of welded steel pipe shall conform to the design specification, and the welder shall have the welding certificate. The ground steel pipe, the open steel tube and the metal stents shall be treated respectively for preservation and painting. The structure of the socket and the used packing of the feedwater cast-iron pipe shall conform to the design requirement and construction specification. 7) pipeline foundation should be used according to the design requirements of natural foundation, the sand, concrete pile foundation or basis, such as the design requirements, should according to the actual situation, using the basis of the rational form. Water piping shall not be carried through sewage structures, and the vertical and horizontal spacing of pipes and sewage pipes shall conform to the design and construction specifications. The test pressure of the water pipeline should not exceed 1000 meters, the experimental pressure and permit penetration should conform to the acceptance specification and fill in the record of the hidden project acceptance. 10) flushing should be disinfected water supply pipe installation is completed, after water rinse, in-line water 24 hours, by the construction unit for water testing, testing is not qualified disinfection, such as unqualified, it must be disinfected. The requirement of backfilling of the channel of feed water pipe can

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档