掌握构筑物满水试验的规定(国外英文资料).doc

掌握构筑物满水试验的规定(国外英文资料).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
掌握构筑物满水试验的规定(国外英文资料)

掌握构筑物满水试验的规定(国外英文资料) In the high school 2K314013 master the regulations for full water test of structures 2k314013 master the regulations for full water test of structures First, the premise of full tank water test 1. the pool structure, concrete compressive strength, impermeability strength or brick masonry cement mortar strength to meet the design requirements; 2., cast-in-place concrete pool waterproof layer, pond external anti-corrosion layer construction and outside the back filling construction; 3. the prefabricated prestressed concrete pool shall be prestressed or coated with cement mortar before spraying; 4. After the completion of the cement mortar inside and outside the brick pond; Two, the structure of full water test procedures According to the following procedures: test preparation - pool water injection - water level observation in the pool - evaporation measurement Three, the structure of full water test requirements (I) water flooding Water was injected into the tank 3 times, and each injection was 1 / 3 of the designed water depth. The rising rate of water injection level shall not exceed 2m / 24h, and the interval between two adjacent water filling periods shall be no less than 24h. After each injection, the water level drop value of 24h should be measured. (two) appearance observation; For large and medium water tanks, the water filled to the bottom of the wall shall be filled to check the impervious quality of the floor. When there is no obvious leakage, continue to fill the water until the water filling depth is the first. In the process of water filling, check the appearance of the pool, and when the water seepage is too large, stop filling and deal with it. (three) water level observation After the water level in the tank is injected to the designed water level 24h, the initial reading of the water level measuring needle is started. The time interval between the reading of the water level and the initial reading shall be no less than 24h. (fou

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档