- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
掌握构筑物满水试验的规定(国外英文资料)
掌握构筑物满水试验的规定(国外英文资料)
In the high school
2K314013 master the regulations for full water test of structures
2k314013 master the regulations for full water test of structures
First, the premise of full tank water test
1. the pool structure, concrete compressive strength, impermeability strength or brick masonry cement mortar strength to meet the design requirements;
2., cast-in-place concrete pool waterproof layer, pond external anti-corrosion layer construction and outside the back filling construction;
3. the prefabricated prestressed concrete pool shall be prestressed or coated with cement mortar before spraying;
4. After the completion of the cement mortar inside and outside the brick pond;
Two, the structure of full water test procedures
According to the following procedures: test preparation - pool water injection - water level observation in the pool - evaporation measurement
Three, the structure of full water test requirements
(I) water flooding
Water was injected into the tank 3 times, and each injection was 1 / 3 of the designed water depth. The rising rate of water injection level shall not exceed 2m / 24h, and the interval between two adjacent water filling periods shall be no less than 24h. After each injection, the water level drop value of 24h should be measured.
(two) appearance observation;
For large and medium water tanks, the water filled to the bottom of the wall shall be filled to check the impervious quality of the floor. When there is no obvious leakage, continue to fill the water until the water filling depth is the first. In the process of water filling, check the appearance of the pool, and when the water seepage is too large, stop filling and deal with it.
(three) water level observation
After the water level in the tank is injected to the designed water level 24h, the initial reading of the water level measuring needle is started. The time interval between the reading of the water level and the initial reading shall be no less than 24h.
(fou
您可能关注的文档
- 形似三角形的性质及其证明方法。(国外英文资料).doc
- 当你发现自己迷路时如何自救(国外英文资料).doc
- 彩信以及彩信收发的基本原理(国外英文资料).doc
- 张家界市内进核心景区主要有三条路(国外英文资料).doc
- 当前魔芋超细粉末的减肥功能(国外英文资料).doc
- 彩电企业的国际化出路(国外英文资料).doc
- 开发软件常见版本名称的含义(国外英文资料).doc
- 彩色电视基本常识(国外英文资料).doc
- 彩虹六号维加斯2-通关有感(国外英文资料).doc
- 彭浪屿攻略(国外英文资料).doc
- 《GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业》.pdf
- GB/T 32151.42-2024温室气体排放核算与报告要求 第42部分:铜冶炼企业.pdf
- GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 中国国家标准 GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法.pdf
- 《GB/T 38048.6-2024表面清洁器具 第6部分:家用和类似用途湿式硬地面清洁器具 性能测试方法》.pdf
- 《GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数》.pdf
- GB/T 18238.2-2024网络安全技术 杂凑函数 第2部分:采用分组密码的杂凑函数.pdf
- 《GB/T 17215.686-2024电测量数据交换 DLMS/COSEM组件 第86部分:社区网络高速PLCISO/IEC 12139-1配置》.pdf
- GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜.pdf
- 《GB/T 13542.4-2024电气绝缘用薄膜 第4部分:聚酯薄膜》.pdf
文档评论(0)