日志1(国外英文资料).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
日志1(国外英文资料)

日志1(国外英文资料) July 10, 2011 sunny After consideration, I chose this site internship, Hua Chen construction Limited by Share Ltd, located in Tianjin District, Beichen City, a large town. A few days ago, I was dreaming about my study, work and life in the next few days. Sitting in a taxi at the surrounding environment, slowly out of the school, I thought: today I finally with the luggage on the journey, it can be said that this is the first time, the first step is to enter the society, this is the starting point of another journey of my life, so I have to seriously this internship, learning hard, practical work. The taxi driver (he said he had worked on the construction site (I) told us and ran strong): you may encounter all kinds of people on the site and suffered some setbacks, who must endure, young people do not impulse to make some stupid, must insist on. Finally arrived at the construction site, I was surprised that the technician was my classmate, he graduated from junior high school after working on the construction site for 6 years, became a technician. I think: work here without higher education students, have the ability to experience, you can fully support here. Since there is no red helmet, we are only wearing yellow hats. In the afternoon, we visited the construction site, and saw the things, pit ditch, pile, open ditch drainage, tower crane, scaffold, template and so on I see. We will work at No. 1, No. 2, 5, 6, 7, 12, 13, and 14. Its sunny in the morning and rainy in the afternoon in July 11, 2011 Today is the second day of my work. Today is the first day of my formal work. Todays main line is the line. Every construction project starts with the construction positioning and laying out, and it relates to the success or failure of the whole project. It is also a crucial link to ensure the quality of the project. The white line is to put on the drawing shape according to the ratio of 1:1 to the ground line staff should not only master the operation of equip

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档