概算(国外英文资料).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
概算(国外英文资料)

概算(国外英文资料) Chapter 1 basic knowledge of construction budget 1, the quota allowance, in the construction project refers to the construction of the normal conditions, the number of standard production units qualified building products required for the consumption of labor, materials and machinery. 2, capital construction refers to the construction, reconstruction, extension, restoration and purchase of equipment of all the expanded reproduction of fixed assets, which are called basic construction. 3, fixed assets refers to the process of social reproduction, can produce or live for a long time, and in the process of using the basic material to maintain the original form of labor or other materials. 4, as the fixed assets of labor data, should also have what conditions? (1) the period of use is more than one year; in the earlier stage, project proposals are proposed, feasibility studies are carried out, design documents are made, bidding is made and contracts are signed. Preparation stage: Construction preparation. Implementation phase: full construction, production preparation. Acceptance stage: completion acceptance, use, post evaluation of the project. 4, investment estimation? In the beginning (the basic construction project proposal, feasibility study and design task book), the construction unit to the state for construction projects to be established, and the preparation of documents for the corresponding economic total investment of construction project in different stages. 5, design budget In the preliminary design stage, preliminary design by the design unit or the expansion of the preliminary design drawings, the fixed budget estimate index, or the cost quota and fee standards as well as the regions natural, technological and economic conditions and equipment according to the budget price data, calculated in advance of construction project completion and acceptance of construction and delivery of all the fees for the use of the file from the planning to. 6, r

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档