脚手架搭设规范施工方案(国外英文资料).doc

脚手架搭设规范施工方案(国外英文资料).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
脚手架搭设规范施工方案(国外英文资料)

脚手架搭设规范施工方案(国外英文资料) Scaffolding erection standard construction program Before 1, scaffolding should be based on the characteristics and construction technology of work to determine the erection scheme, including: basic treatment, erection requirements, bar spacing and wall connecting rod position, connection method, and construction drawing and drawing drawing. 2, scaffolding erection height exceeding the specifications shall be calculated. (1) when the fastener type steel pipe scaffold is set up in accordance with the following table, the corresponding rod can no longer be designed and calculated. But even the wall member and the vertical foundation bearing capacity should still be designed and calculated according to the actual load and draw the construction drawing. (2) when the erection height is between 25 and 50m, the overall stability of the scaffold should be strengthened from the structure. Such as longitudinal scissors must continuously increase the lateral set, scissors, wall connecting rod strength increase, the decrease of the distance between, and scaffolding in windy areas on the erection of a height of more than 40m, considering wind up vortex force, should be set in the level of the wall at the same time, there should be anti lifting and turning flow the wall measures, to ensure the safe use of scaffolding. (3) when the erection of a height of more than 50m, can adopt the double pole strengthening or piecewise unloading, all along the scaffold will High Sublevel scaffolding and beam slab structure with wire rope pull, will be part of the load of the scaffold to undertake building; or by segment erection, each section of scaffolding to load by buildings out of the cantilever beam, and the design and calculation of frame bear. (4) the design and calculation of the scaffold must comply with the relevant provisions of the scaffold specifications and be subject to examination and approval by the technical person in charge of the enterprise. 3, scaffoldin

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档