5certiicate证书.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
5certiicate证书

(2)The stage of formal acceptance 1)The formal acceptance is divided into two stages and include single item acceptance and all check and accept. The 1 H420153 finishes construction the contents of acceptance Two, finish construction before checking and accepting beard completion of acceptance item (A)Hand over work acceptance 1.construction engineering items handing over work acceptance should meet the following rules: (1)Constucting the unit has already pressed the examining of the engineering contracted completion engineering balanced of accounts, and sign to settle accounts a document. (2)Designing the unit has already completed to finish construction diagram. (3)The construction unit presses the rules of national standard or profession standard toward construction the unit hand over the engineering construction hand over a work technique document. (4)The construction unit submits engineering quality to protect to write letter. (5)Engineering superintendency unit according to request to constuct the unit handover superintendency document. 4.the construction engineering item execution always contract for or practice to investigate, design, buy, construction of an or many items always contract for of, from total Contract for unit to press contract engagement and above-mentioned related request unit to hand over work toward the construction. (Two)Particularly the item checks and accepts 1.general rules (1)Constucting the fire fight, occupation hygiene of engineering item and laboring safe hygiene and environmental protection facilities has to synchronously check with corpus engineering Accept, having not yet acceptance or checking and accepting unqualifiedly can not throw in an use. (2)Constuct engineering item to throw in before circulating, should complete the fire fight facilities technique test. (3)Constuct engineering item to try to produce a stage, should to the occupation hygiene, labor safe implementation monitors, such as hygiene and environmental protect

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档