隧道湿软地基奥法施工英文版.doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
隧道湿软地基奥法施工英文版

World Tunnel Congress 2008 - Underground Facilities for Better Environment and Safety - India Construction of mined tunnel in soft ground with NATM in Pirpanjal tunnel VA (KM. 152.600 – KM. 158.730) S.D. Jeur M. Gupta Hindustan Construction Co.Ltd, Mumbai, India SYNOPSIS: The case study explains the methodology and the state of art technology that was adopted in the construction of the first 650m from the South end of the Pirpanjal Tunnel Project in soft ground that consisted primarily of silty clay with boulder infested patches. The case study also reflects on the integral techniques of the NATM and how the same was utilized to suit the project requirement. It further goes on to describe the modifications to the general methodology that has to be incorporated due to the presence of fairly populated village above the alignment of the tunnel with very low overburden (20 – 40m). The job required involvement of various specialized machineries. The machineries were also been detailed hereunder with their specialty. 1. INTRODUCTION The existence of the only lifeline of transportation NH-1A connecting the planes of Jammu with the Kashmir valley has always being a point of concern. Frequent land slides and blockages in the snow bound winter times always demanded an alternative. Adding to the same, the matter that Railway network has not till date been established in this important state of ever developing India has always bothered the think tanks of Indian development. Drawing a solution, resolving the two-fold concern Northern Railways released their master plan to extend the railway service beyond Udhampur to Baramulla via Srinagar. IRCON International Limited took up the job for construction of the project from Laole to Quazigund and subletted the work of construction of the T-80 Tunnel extending from Ch. 152.600 to Ch. 163.560 to Hindustan Construction Co. Ltd. The contract work included excavation work with full support system for 10.350 km permanent concrete linin

文档评论(0)

xcs88858 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8130065136000003

1亿VIP精品文档

相关文档