- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
广州地铁西村站近接高架桥桩基影响分区及应用研究
王明年1,崔光耀1,喻 波2
(1. 西南交通大学土木工程学院,四川 成都 610031;2. 中国中铁二院工程集团有限责任公司,四川 成都 610031)
摘要:广州地铁西村站为暗挖法施工的隧道群,近接9组高架桥桩基,其中隧道与桩基XJ33最小净距仅2.30 m。为保证高架桥的使用安全性,采用有限差分法和最小二乘法原理,对近接高架桥桩基进行近接影响分区研究,并根据分区结果对桩基进行分类,确定各类桩基沉降集中区,并对其提出可靠的加固方案;同时建立西村站近接桩基监控等级等级中图分类号: 文献标识码:A 文章编号:INFLUENTIAL PARTITION AND APPLICATION OF ADJACENT VIADUCT PILE FOUNDATIONS IN XICUN STATION OF Guangzhou Metro
WANG Mingnian1,CUI Guangyao1,YU Bo2
(1. School of Civil Engineering,Southwest Jiaotong University,Chengdu,Sichuan 610031,China;2. China Railway No.2 Engineering Group Co.,Ltd.,Chengdu,Sichuan 610031,China)
Abstract: groups of viaduct pile foundations are located in the vicinity of Xicun station of Guangzhou metro which is constructed by subsurface excavation method. The minimum clear distance is 2.30 m between the tunnel of Xicun station and pile foundation XJ33. To ensure the use safety of the viaduct,the least squares principle and finite difference method are used study the influential partition of the pile foundations. The outcome of the influential partition is used for classification of pile foundations. And the concentrated areas of pile foundation settlement of the various types of pile foundations are determined. These results are applied to present the program of reinforcement and the management level of monitoring and measurement of the various types of pile foundations. The results show that the influential partition of the viaduct pile foundation is divided into four regions because of the tunnel excavation of Xicun station. Accordingly,the pile foundationdivided into four categories. The concentrated area of pile foundation settlement of pile type A is 2.0D(D is the diameter of tunnel) section before tunnel face and 3.0D section after tunnel face,1.0D section before tunnel face and 3.0D section after tunnel face for pile type B,and 0.5D section before tunnel face and 2.0D section after tunnel face for pile type C. Nine groups of viaduct pile foundations
您可能关注的文档
最近下载
- 学生公寓施工组织设计毕业设计.doc
- 2023-2024年度执业药师继续教育儿科常用中成药的合理使用参考答案.docx VIP
- 2022年上海注册会计师(CPA)考试考前冲刺卷14测.docx VIP
- 食管癌病人食道支架植入术疑难病例讨论.ppt VIP
- 12《〈论语〉十二章》公开课一等奖创新教案 部编版七年级语文上册.docx VIP
- 婴儿教育发展历史现状和反思.doc VIP
- 江苏省安装工程计价定额2014版.pdf
- 2023年广东省汉语言文学(本科)《唐宋词研究》自考试题(含答案).pdf
- 《基础护理》教学教案.doc VIP
- 视频创推员(四级)职业鉴定考试题库(浓缩500题).docx
文档评论(0)