- 1、本文档共21页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
后效射孔-英文-新
Aftereffect Perforation Advantages Stable Property Aftereffect body is specially-made polymer without exploding basis source: under high temperature, its physical and chemical properties are stable: under low temperature, it will not become brittle or invalid; immerged in oily water, it will not become dangerous. With characteristics of high temperature resistance and impact resistance, it is safe and environment friendly during transportation, storage and site operation. Aftereffect Perforation Advantages Safe Operation Aftereffect body and regular perforation bullet are coaxial integrated appliances, after regular perforation bullet detonating, the aftereffect body is detonated, its energy is carried on main jet, instantly acts on reservoir space, which can maintain or decrease annular pressure inside gun all over the perforation process so as to effectively avoid gun exploding or sticking. * Increasing annular pressure Traditional enhanced perforation Aftereffect perforation Decreasing annular pressure Aftereffect Perforation Advantages Healthy and Environment Friendly Aftereffect body doesn’t contain radioactive substances or flammable explosive ingredients. After operation, it will not leave any residue so that it will not cause any pollution to borehole, reservoir and ambient environment. Aftereffect Perforation Application Cases Well completion of CNOOC Tianjin Branch Bohai HK block adopts perforation and production pipe column combination technology, after perforation they do not lift gun but produce directly. The perforation layer is sand 2nd section of Shahejie Formation, average porosity 16.3%, average permeability 42.7md, perforation section 3546-3589.3m, net perforation depth 27.9m. Using 430 sets type 127 aftereffect body, production after perforation reaches 300m3/d, far more than estimated production 70m3/d. Aftereffect Perforation is upgrading technology production of cluster perforation Bozhong certain well, most of reservoir in perforat
文档评论(0)