- 1、本文档共17页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
002机械挖土施工工艺(国外英语资料)
002机械挖土施工工艺(国外英语资料)
Mechanical excavation
1 range
The technological standards are applicable to the mechanical excavation of large pits (troughs), pipes and large areas of industrial and civil buildings and structures.
2 construction preparation
2.1 main machines and tools:
2.1.1 excavators are: excavators, bulldozers, scrapers, dump trucks and so on.
2.1.2 general machine has a spade (tip, flat two), trolleys, small white lines or 20 wire and steel tape and slope etc..
2.2 operating conditions:
2.2.1 earthwork excavation, should be in accordance with the requirements of the construction program, the construction area of the ground, ground obstacles cleared and disposed of.
Location of 2.2.2 buildings or structures or the location of the site of the control line (pile), the standard size of pile and the slot of the gray line, must pass the test; and after finishing pre screening procedures.
2.2.3 during the night construction, there should be adequate lighting facilities; in danger areas should be marked clearly, and reasonable arrangements for excavation order, to prevent excavation or excavation.
When excavating the foundation pit and canal ditch with 2.2.4 water level, measures should be taken to reduce the water table according to the local engineering geological data. Generally down to the excavation surface of 0.5m, and then excavation.
2.2.5 construction machinery entering the site, the road, bridge and unloading facilities should be checked in advance, if necessary, for reinforcement or widening and other preparatory work.
2.2.6 earth moving machinery, according to the construction area of the terrain and the operating conditions, soil type and thickness, the total project amount and time into consideration, in order to be able to play to determine the efficiency of the construction machinery, good construction plan.
2.2.7 construction area running route layout should be determined according to the engineering work area size, mechanical properties, distance
您可能关注的文档
- 001华旗资讯公司介绍(国外英语资料).doc
- ...winter 09电路设计案例教程》-第20讲 10.5 PCB板设计技巧_百度文库...(国外英语资料).doc
- 002-140804-[读书]嫉羡、嫉妒与贪婪(国外英语资料).doc
- !!B4 20世纪欧美文学(国外英语资料).doc
- .net多线程学习(国外英语资料).doc
- - CAD笔记本。(国外英语资料).doc
- 001人工挖土施工工艺(国外英语资料).doc
- !!各种身材穿牛仔裤的讲究vs了解羽绒服(国外英语资料).doc
- 01.班主任兵法系列一、引言(国外英语资料).doc
- 008年石家庄市第二十八中学初三年级一模考试(国外英语资料).doc
- 2025年安徽工商职业学院单招职业技能测试题库带答案(典型题).docx
- 2025年洛阳科技职业学院单招职业技能测试题库带答案(新).docx
- 2025年荆门职业学院单招职业技能测试题库及答案(易错题).docx
- 2025年宣化科技职业学院单招职业技能测试题库(精练).docx
- 2025年包头职业技术学院单招职业技能测试题库带答案(新).docx
- 2025年江西工商职业技术学院单招职业技能测试题库带答案(精练).docx
- 2025年黑龙江农业经济职业学院单招职业技能测试题库精编.docx
- 2025年山东艺术设计职业学院单招职业技能测试题库带答案(基础题).docx
- 2025年陕西工商职业学院单招职业技能测试题库带答案(突破训练).docx
- 2025年承德护理职业学院单招职业技能测试题库【word】.docx
文档评论(0)