网站大量收购独家精品文档,联系QQ:2885784924

2011年一级建筑师铁路工程演习1(国外英语资料).doc

2011年一级建筑师铁路工程演习1(国外英语资料).doc

  1. 1、本文档共3页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2011年一级建筑师铁路工程演习1(国外英语资料)

2011年一级建造师铁路工程练习1(国外英语资料) In 2011, a construction division of railway engineering exercises (2): br br / Recommendation: 2011 a construction division of railway engineering exercises summary evaluation method of engineering materials IC412000 IC412010 cement quality inspection and the scope of review points using 1. familiar with cement 2. familiar with the evaluation method of cement quality inspection of cement using a range of 3. with 1. multiple-choice questions not added any mixed materials of pure clinker cement called (). A.I Portland cement, B. II Portland cement, C. Portland cement, D. special cement 2., cement mixed with 6% ~ 15% admixture of cement is called (). A. slag Portland cement, B. volcanic ash Portland cement, C. ordinary portland cement, D. type II Portland cement, 3. cement called P.S. A. ordinary portland cement, B. fly ash Portland cement, C. volcanic ash Portland cement, D. slag Portland cement 4. cement test results evaluation, waste cement refers to () does not meet the standard cement. The fineness of A., the final setting time of any B, Magnesium Oxide three, sulfur dioxide, initial setting time and soundness of any of the C. volcano ash slag cement, cement and fly ash cement admixture limit of D. cement packaging logo, variety, grade, producer name and serial number 5. of the concrete has high strength under the condition of not using (). A. Portland cement, B. ordinary portland cement, C. fast hardening portland cement, D., pozzolanic cement 6., shall not be used under heavy and bulky conditions. A. rhpc / br br / B. ordinary portland cement, C. slag cement, D. fly ash cement 7. can not be used in dry environment. A. pill, ordinary cement, B., pozzolanic cement, C. Portland cement, D. slag cement, B. are used in special cement, and pavement engineering is generally adopted in order to meet the requirement of high folding. A. dam cement B. ordinary portland cement C. road Portland cement D. masonry cement 9. mainly used for mass conc

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档