- 1、本文档共19页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
CAD考证题目以及技巧(国外英语资料)
CAD考证题目以及技巧(国外英语资料)
CAD grade test questions
Fill in the blanks (60 minutes)
1, the role of viewres: ______ precision _________________________________ display graphics.
2, Ctrl+Z: for _____ abandon operation ________, draw a straight line to cancel a step input ______ right, any operation process, want to stop, can press the button _____.
3, the plane drawing, we can use the relative Cartesian coordinates and to control the starting point of the line segment relative polar coordinate format, respectively _______ and _________.
4, open the file system variables control whether in the form of a dialog box is displayed: _______________.
The system variables 5, auto save time to determine is: ___________, to _______ as time unit.
6, whether the filling control system of variable show is: _________________.
7, AutoCAD file extension ___________, template file extension ______________.
8, A4 drawing size is: ________________A3 the size is: _________________ drawings.
9, in the words of the input, the following symbols: how to input _________ + phi _________ ~ _________
10, 1 inches =_________ mm, 1 feet =__________ cm.
11, open the multi segment line (blast) after decomposition can input ________ are connected as a whole.
12, line length can be controlled by adjusting the object properties in _____________.
13, area of inquiry, A ___________S _______________.
14, in the array operation, R _____________, P _______________.
15, when the label, the tolerance size of ___________________________________ formula.
16, the operation layer, all layers can be closed, __________ layer can not freeze.
17, DT ________________MT ___________________.
18, in AutoCAD2000, the block should be replaced if B input ______, instead of A, then A is the ________ production, B is made by _______.
19, to apply attributes of an object to other objects. ______________ available.
20, in AutoCAD, only ____________ and ___________ can carry out Boolean operation.
21, the divided circle with operation,
您可能关注的文档
最近下载
- 小学体育课程中的体育游戏设计与实践研究教学研究课题报告.docx
- 《动物生理学实验》(兰州大学)中国大学MOOC(慕课)章节测验试题(答案).pdf
- 2025年阿拉善职业技术学院单招职业适应性测试题库及参考答案.docx VIP
- 正面描写与侧面描写作文指导课件.ppt VIP
- 霍尼韦尔功能块手册中文版.pdf VIP
- 危险化学品考试题.pdf VIP
- 连续自动监测(水污染)练习题-选择题及答案.docx VIP
- 2022年哈尔滨南岗中小学教师招聘考试真题(含答案).pdf VIP
- 展示设计 课件全套 第1--6章 展示设计概述---展示设计程序与表现.pptx
- 全国第三届职业技能大赛(信息通信网络运行管理项目)选拔赛理论考试题库资料(含答案).pdf
文档评论(0)