怎样落实企业制定的展会营销计划.ppt

  1. 1、本文档共39页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
怎样落实企业制定的展会营销计划

Implementation of the Reformed IPC at the UK Patent Office John Earley Project Manager, UKPO Geneva, July 2006 Contents 1. Implementation of the Reformed IPC and ECLA 2. IT aspects of implementation 3. Examiner training and guidance 4. Generating IPC8 terms using Classtool 5. Conclusion Implementation of the Reformed IPC and ECLA Introduction 2000-2005: UKPO classify on UKC and IPC7 and search on UKC and ECLA We knew that IPC8 was due for introduction on 1 January 2005 … but it was postponed for one year at the request of the EPO; this was welcomed by many! Extra year eased our preparations EPO ask UK to “participate in ECLA classification” Herwig Pauwels (EPO) asked us in 2001 Reasons: - to widen coverage of EPOQUE to include documents not previously classified to ECLA - in the case of GB documents, to save EPO classification effort UK agreed at a “high level” in 2002 Decisions on ECLA/IPC8 Feb 2003 – paper on IT aspects of new IPC Senior management comment “I want us to walk so close to the EPO that we could win a 3-legged race” Dec 2003 – decision to classify UK patent applications on ECLA; automatic conversion of ECLA terms to generate AL IPC8 terms Preparatory consultations Many avenues of consultation including: EPO Member States meetings in The Hague Many meetings with the EPO, on a bilateral basis or in fringes of meetings Consultations with Sweden who started the process earlier IPC CE meetings in Geneva and separate meetings for IT experts 2. IT aspects of implementation Strategy for IPC8 and ECLA classification Strategy paper produced outlining: - steps needed - training needed - timetable for each step to be completed (over a period up to November 2005), and - risk assessments Risk assessment Only significant risk: IT solutions may not be ready in time for mid-November 2005 Contingency plan: no ECLA classification, no classtool (see later), make IPC8 terms valid on OPTICS (see later), apply IPC7 and new IPC8 terms

文档评论(0)

shuwkb + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档