- 1、本文档共119页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
鲁班路转盘信号控制 * 国家精品课程:交通控制与管理 * * * 国家精品课程:交通控制与管理 * The TMC has responsibility for the whole state of New South Wales, not just the City of Sydney. SCATS is installed in cities on the border of NSW and Queensland at Tweed Heads approximately 1000kilometeres and also in Albury on the NSW Victoria border. SCATS is also installed in NSW country towns such as Orange, Coffs Harbour and Bathurst. The TMC can monitor and interface with all of these regional cities in the State. * * * * * * * * * * * Using data from nominated detectors at representative intersections, SCATS calculates every cycle: A recommended cycle time or RL. The current cycle time (CL) will move towards the RL if allowed (ie the CL may be LOCKED and cannot move). The change to CL is limited to prevent over-reaction. Usually it can move within the range of +/- 6 seconds (ie if CL is 82 and RL is 84, CL changes to 84). However, if a trend in excess of 6 seconds in one direction is established for 3 consecutive cycles, CL can change within the range of +/- 9 seconds. (ie if CL is 65 and RL is 100 seconds for 6 cycles, CL becomes 66, 72, 81, 90, 99, 100. Phase or STAGE times. These are contained in phase split plans which are defined by the traffic engineer (each intersection may have 1, 4 or 8 split plans). SCATS votes for a the split plan which would produce the most equalised saturation on each of the monitored approaches. Two methods are available for picking the plan with the best phase splits: Vote for the plan which would result in the lowest equalised saturation on all nominated approaches. If 2 votes for the same plan are produced in the last 3 cycles, SCATS copies the contents of that plan into the running plan. Using a table of changes to the running plan (increments and decrements within a range of +/- 4%) , select the best change to the running plan. No plan voting is used. * Using data from nominated detectors at representative intersections, SCATS calculates every cycle: A recommended c
您可能关注的文档
最近下载
- 演出合同范本13篇.pdf VIP
- 佳能EOS6D使用说明.docx
- 世茂集团工程招投标技术标管理制度.docx
- 长安铃木吉姆尼电路图.pdf
- 美国材料与试验协会A480-A480M-2016_平扎不锈钢及耐热钢中板、薄板及钢带的一般要求[1](中文版).doc
- 地铁保洁服务投标方案(技术标).docx
- 2022年湖南衡阳市衡东县人大代表服务中心选调考试备考试题及答案解析.docx VIP
- 3完整版本.1固相反应.ppt VIP
- 2025高考英语时事热点阅读专练10 自然和宇宙探索(学生版+解析版).docx
- 2023年北京中考数学重难题型01新定义创新型综合压轴问题(13-22年最后一题+真题10道模拟30道)含详解.pdf VIP
文档评论(0)