- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第六章:灾难恢复与业务连续性计划
C6-1 During an audit, an IS auditor notes that an organizations business continuity plan (BCP) does not adequately address information confidentiality during a recovery process. The IS auditor should recommend that the plan be modified to include:
A .the level of information security required when business recovery procedures are invoked.
B. information security roles and responsibilities in the crisis management structure.
C. information security resource requirements.
D. change management procedures for information security that could affect business continuity arrangements.
6-1 在审计中,一个IS审计师注意到一个组织的业务持续计划不能适当解决恢复过程中的信息机密性。这个IS审计师应该推荐计划被修改:
A.当业务恢复进程被启用时信息安全所需要的层次
B.在危机管理架构中的信息安全角色和责任
C.信息安全资源需求
D.信息安全的改变管理进程可能会影响业务持续安排
A Business should consider whether information security levels required during recovery should be the same, lower or higher than when business is operating normally. In particular, any special rules for access to confidential data during a crisis need to be identified. The other choices do not directly address the information confidentiality issue.
答案A解析:.业务应该考虑是否在恢复时需要相同的安全级别,或者比平时的低或者高。特别的是,一些在紧急时候访问加密数据的规则需要被辨识。其他选项并不直接解决信息机密性问题。
C6-2 During a disaster recovery test, an IS auditor observes that the performance of the disaster recovery sites server is slow. To find the root cause of this, the IS auditor should FIRST review the:
A. event error log generated at the disaster recovery site.
B. disaster recovery test plan.
C. disaster recovery plan (DRP).
D. configurations and alignment of the primary and disaster recovery sites.
6-2 在灾难恢复测试中,一个IS审计师发现灾难恢复站点的服务器缓慢,为了找出根本原因,信息系统审计师应该首先审查:
A.灾难备份点的事件错误日志生成
B.灾难备份测试计划
C.灾难备份计划
D.配置并确保主站与和灾难备份点保持一致
D Since the configuration of the system is the most probable cause, the IS auditor should review that first. If the issue cannot be clarified, the IS auditor should then review the event error log. The disaster recovery test plan and the disaster recovery plan (DRP) would
您可能关注的文档
最近下载
- 2024年大数据技术试题库(含答案).pdf
- 艾兰德ALD6000P系列变频器使用手册(中文).pdf
- NB∕SH∕T 0944.2-2020 润滑剂抗磨损性能的测定 FE8滚动轴承磨损试验机法 第2部分:润滑脂.pdf
- 四川大学2020年11月课程考试考试《103014电子商务》参考答案.doc
- 廉洁案例教育(廉洁党课)-1.ppt VIP
- 游泳馆突发紧急事件处理预案.doc
- 国开(中央电大)专科《财务管理》网上形考(任务一至四)试题及答案.docx
- 我的教育教学故事(荟萃20篇).docx VIP
- 部编版小学语文六年级上册期中考试试卷(含答案).doc
- 数学北师大版五年级上《比较图形的面积》说课课件.pptx
文档评论(0)