9短螺旋成孔灌注桩通用施工工艺(国外英文资料).doc

9短螺旋成孔灌注桩通用施工工艺(国外英文资料).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
9短螺旋成孔灌注桩通用施工工艺(国外英文资料)

9短螺旋成孔灌注桩通用施工工艺(国外英文资料) This paper consists of 349319852 contributions DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. QB Sinopec group Enterprise (general process) standard Fourth construction company By the construction volume. FCC/TS06.11-09 General construction technology of short spiral bored pile 2006-122006-12-20 Publishing 2007-012007-01-01 real Shi General construction technology for field installation of pressure vessel FCC/TS06.02-01 Sinopec Group Fourth Construction Company technical department issued 01-2 General construction technology of short spiral bored pile FCC/TS06.11-09 General construction technology of short spiral bored pile One Scope of application This standard is applicable to the construction of short spiral dry hole filling pile in building engineering. Two 2.1, a) b) C 2.2 A) b) Construction preparation Material: steel varieties, specifications should comply with the design requirements, and factory quality certificate, enter should retest; welding: must have factory certification, specifications and models to meet the requirement of welding; concrete: raw material quality must comply with the relevant regulations, the strength grade should comply with the design requirements. The short spiral drill equipment; auxiliary construction equipment: forklifts, cranes, electric welding machine, vibrator, measuring rope, line sinkers, Kong Jingyi, ruler, level and plumb, theodolite, instrument, slump sediment. 2.3, a) b) C 2.4 A) b) The operating conditions to remove or move end ground, underground pipelines and other obstacles, and for written procedures necessary; on site muck removal, smooth rolling, to achieve the three links one ping; to inspect, construction machinery and equipment debugging. Technical preparation, careful review of construction drawings, preparation of construction plans and approval. Technical explanation to the opera

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档