bucuo(国外英文资料).doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
bucuo(国外英文资料)

bucuo(国外英文资料) I. explain the noun (fill in the blanks after the question, 2 points per subject, 20 points) 1. merchandiser P3 Answer: factory director, general manager, and all around the order to work, the delivery of the responsible person, are merchandiser. 2. shipping mark P216-217 Answer: marks are shipping (Mark), commonly known as writing, stamping, or brushing in the outer package of graphics, text, and numbers. It is usually composed of a simple geometric figure and some letters, numbers and simple text. The main contents include: consignee code, destination, part number, lot number. 3. screen printing P47 Answer: screen printing is OEM products, according to customer requirements, network printing customer brand or technical parameters in the product. 4.ISO9000 P123 Answer: the original intention is quality assurance system is to provide an enterprise to ensure the quality of the product or service points, management principles, norms, it requires that an enterprise must have what system, which records, what guidelines and finally to quality assurance. In fact, because the enterprise management is a complete, integrated, launched the main line of the management system and quality assurance from, just to the extraordinary role in the enterprise management: ISO9000= quality assurance management system and scientific management system and scientific guide 5. finished product storage order P132 Answer: one is the finished product storage warehousing inventory management credentials (finished once the storage, warehouse personnel responsibilities that has the responsibility to explain its future direction, as well as to) manufacturing (assembly) on the basis of piecework calculation, a warehouse can be finished one dare to receive the correct output, paul. 6., the 28 law, P171 Answer: for any job, of which 80% of the task is only 20% of the time to complete, but the remaining 20% of the task will take 80% of the time to do well. 7. business reception P186 Answ

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档