冲孔桩偏孔改正办法(国外英文资料).doc

冲孔桩偏孔改正办法(国外英文资料).doc

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
冲孔桩偏孔改正办法(国外英文资料)

冲孔桩偏孔纠正措施(国外英文资料) An impact drill in Hunan karst area construction, pile diameter of 1400 27m deep hole, before a construction team in the exit card hammer and other factors after 18m drilling, the hole backfilled. After February, I took over the younger brother, before the technician did not tell me about the partial hole problem, only said the card hammer. I found in drilling to 16.5M has partial empty hole, the wire rope swing amplitude is very large, then throwing stones to rectify drilling hole, so repeated 7 days, drilled to 18.5 meters, although there is a single hole partial amplitude deviation has little to continue drilling to 20 meters from 18.5 meters to 20 meters long week, while drilling deviation, but the effect is getting worse, 20.4 meters of wire rope and orifice center deviation 30cm, there have been 90 cubic meters of rubble backfill, took 21 days. Again after 3 days, so repeated, still no effect. 21 meters to 24 meters, there is a layer of karst cave, must go through the cave to the cave, the bottom of the rock embedded more than 1.5 meters in order to end hole. Backfill, after natural dense (15 days) manual excavation treatment. Thank you. On the first floor, the site has previously had a hollowed out pile, which has been withdrawn from the site because of its abundant groundwater and pumping difficulties. The strength of backfill and the rock rubble should strength similar to it, according to your data, you may be the development of drilling in karst limestone strata, this is hard because of the difference, so easy to deflect, so we should pay attention to when the rubble backfill, preferably stone fill high strength. By way of rotary drilling hole, drill with rolling or ring cutting, design the drilling pressure and speed control, good footage, another two monitoring vertical direction, limestone formation is not a problem, but the cost is relatively high, tight for reference Thank you for giving me advice, 3 floor, block stone is the streng

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档