- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
国际工程廉洁承诺模板
国际工程廉洁承诺模板
篇一:国际工程完工承诺模板英语
Project Completion Commitment
Our company(公司名称) is highly interested and willing to construct theXXXX project. If the project is successfully signed, we would strictly follow the international construction practices, subject to the local construction specifications and criteria, and perform quality responsibilities and obligations of the construction unit to ensure project construction quality to meet the design requirements and construction quality criteria, and therefore to undertake:
1. The conditions of the contract: to recognize and accept therequirements and conditions of the quot;tender documentsquot;
2. Time commitment: If successfully signed the contract, we guarantee that once receiving the start notification we will start within the specified time, andto completethe construction within the contract period as required.
3. Quality commitment: we will be in accordance with the technical requirements and the requirements of the tender documents for the construction, and ensure to reach acceptance standards and meet the quality standards;
4. Safe and civilizedconstruction commitment: we will strictly
adhere to safe production license regulations, to ensure the safe completion of the project, to achieve safe and civilized construction site; 5. The commitment to submit billing information: After30days ofthe project was officially handed over ,we will submit a complete and effective billing information at one time ;
6. Pay wages of construction workers: we will establish a roster of construction workers to put the payroll in public every month, and accept the supervision and verification of local labor and social security department to ensure that workers are paid in time ;
7. Warranty: we commit that, in the contract warranty period,we will be responsible for any quality defects and the consequences resulting from it. And fulfill warranty obligations according to the contract of the project.
8.Training: we will arrange necess
文档评论(0)