Herrenknecht AG公司介绍.doc

  1. 1、本文档共34页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
HerrenknechtAG公司介绍概要1

Jinping Drainage Tunnel Project P.R. of China Single Gripper Hard Rock TBM ?6,000mm Techn. Doc. No. A-2312-00 11. S-271 TBM history and reference Page 57 08.12.06 N.Zuber/zh 57 / 58 Herrenknecht AG Schlehenweg 2 _ D-77963 Schwanau I:\GM_Projects\Asia\China\Jinping\A_Offer_Phase\Offer_Drainage_Tunnel\00_01.DOC 1. Company introduction Herrenknecht AG was founded by Martin Herrenknecht in 1977. In 1980, an office and a workshop were established in Schwanau - southern Germany, near the French and Swiss borders. The headquarters in Schwanau are located near the airports of Stuttgart, Strasbourg (France) and Basle (Switzerland). Today, the company has more than 1,800 employees world-wide of which 1,200 work in Schwanau. The manufacturing and assembly area has grown to 69,800m2 and comprises ultra-modern production plants and office facilities. Herrenknecht AG facilities in Schwanau – Germany As a manufacturer of tunnelling machines, Herrenknecht AG is unique in the sense that it covers the complete range of tunnelling machines in terms of size and suitability to geological conditions. _ from large diameter from 4,000mm up to 15,470mm used for road and railway, metro and water tunnels down to the smallest 100mm outside diameter fully automatic microtunnelling machine, house connection machines and HDD-Equipment, _ from soft, water bearing non-cohesive soils to hard rock up to 300MPa compressive strength. In total, Herrenknecht AG has supplied more than 1,300 tunnelling machines worldwide. 1.1 Production facilities The headquarters at Schwanau comprises the following facilities: Production facilities Assembly of large diameter machines 32,500m2 Engineering and Administration 6,500m2 Assembly microtunnelling machines 16,800m2 Production plant TBM components 10,000m2 Apprentice training area 600m2 Equipment storage / parking 24,000m2 Lifting facilities – cranes 80 tons capacity 4No. 64 tons capacity 6No. 50 tons capacity 1No. 32 tons capacity 26No. 20 tons capacity 3No. 16 to

文档评论(0)

yaocen + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档