- 1、本文档共53页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
介绍 operation management 项目管理8
Product and Service Processes * * * * * * * * * * * 6-* In-process inventory costs can be high Challenging routing and scheduling Equipment utilization rates are low Material handling slow and inefficient Complexities often reduce span of supervision Special attention for each product or customer Accounting and purchasing are more involved Disadvantages of Process Layouts 6-* Fixed-Position Layouts Fixed-position Layout: Layout in which the product or project remains stationary, and workers, materials, and equipment are moved as needed Nature of the product dictates this type of layout Weight Size Bulk Large construction projects 6-* Cellular Production Layout in which machines are grouped into a cell that can process items that have similar processing requirements Group Technology The grouping into part families of items with similar design or manufacturing characteristics Cellular Layouts 6-* Dimension Functional Cellular Number of moves between departments many few Travel distances longer shorter Travel paths variable fixed Job waiting times greater shorter Throughput time higher lower Amount of work in process higher lower Supervision difficulty higher lower Scheduling complexity higher lower Equipment utilization lower higher Table 6.3 Functional vs. Cellular Layouts 6-* Warehouse and storage layouts Retail layouts Office layouts Service layouts must be aesthetically pleasing as well as functional Service Layouts 6-* Line balancing is the process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements. Design Product Layouts: Line Balancing 6-* Cycle time is the maximum time allowed at each workstation to complete its set of tasks on a unit. Cycle Time 6-* Determine Maximum Output 6-* Determine the Minimum Number of Workstations Required 6-* Precedence diagram: Tool used in line balancing to display elemental tasks and sequence requirements A Simple Precedence Diagram a b c d e 0.1 min. 0.7 min.
您可能关注的文档
- 仁爱版初中英语七到九年级重点句型汇总.doc
- 仁爱版八年级英语下U5T1导学案.doc
- 仁爱版八年级unit1-2复习.ppt
- 仁爱版八年级下册Unit 6 Topic 1 Section B.ppt
- 仁爱版英语七年级(上)期末测试题.doc
- 仁爱版英语七下Unit8-Topic1((Section-B)).ppt
- 仁爱版八年级下册Unit 7 Topic 2 Section D.ppt
- 仁爱版英语九年级unit4练习题.doc
- 仁爱版八年级上册Unit 4 Topic 3 Section B.ppt
- 仁爱版英语八年级上册期末复习.ppt
- 七章货物的保险.pptx
- 三章国际间接投资.pptx
- 人性假设理论.pptx
- 外研高一英语必修三ModuleIntroduction汇总市公开课获奖课件省名师示范课获奖课件.pptx
- 月相成因优质获奖课件.pptx
- 小学二年级语文课件《狐假虎威》省名师优质课赛课获奖课件市赛课一等奖课件.pptx
- 养羊业概况专题知识讲座.pptx
- 微生物的实验室培养市公开课获奖课件省名师示范课获奖课件.pptx
- 人教版六年级下册式与方程整理与复习市公开课获奖课件省名师示范课获奖课件.pptx
- 必威体育精装版高中精品语文教学:第二单元-第7课-诗三首:涉江采芙蓉、-短歌行、归园田居市公开课获奖课件省名师.pptx
文档评论(0)