埃森哲-番禺南沙物流园信息系统建设建议书.ppt

埃森哲-番禺南沙物流园信息系统建设建议书.ppt

  1. 1、本文档共78页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
埃森哲-番禺南沙物流园信息系统建设建议书

* * Strategic Alternatives-Cash Flow Summary Building a new facility to capture additional sale growth offers a higher net present value and internal rate of return than the baseline case and repairing the current facility and limiting sales Scenario Execution Strategy Net Capital Requirement Cumulative Operations Savings Additional Earnings Net Present Value Internal Rate Of Return Baseline (no capacity exp) Stay in Existing Facility Implement Base Process Improvements $9,000,000 $5,867,428 $0 ($5,287,323) -16.2% Alternative #1 (limit growth) Stay in Existing Facility Implement Optimized Operations $9,300,000 $14,062,037 $0 ($30,673) 6.4% Alternative #2 (add capacity) Construct New Facility Implement Optimized Operations $31,325,000 $17,668,175 $24,709,062 $4,912,527 11.1% * * Implementation Plan Task Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Implement Process Improvements Implement WMS Site Selection Detailed Design Prepare Specifications Evaluate Specifications/ vendors Select vendor/ Contractor Preliminary Engineering Detailed Engineering Procurement Permits construction Transition into new facility Fully operational * * Table of Contents Project Background Requirement of Successful Distribution Center Project Approach Deliverable Sample: 1. Phase I:“Conceptual Design” 2. Phase II: “Detail Design” Accenture Capability * * New Facility Layout The new facility will include 390,000 sq. ft of warehouse space and 40,000 sq. ft. of office space * * Contractor Selection The second phase was the bid process, where a pre-architectural building specification/RFP was developed, identifying facility requirements * * Contractor Selection Vendor meetings were held on November 13 14, with the remaining firms proposing their capabilities and initial cost estimates Attendees: Client Accenture John Purvis Charles Eason Bill Crenshaw Bobby Bounds Rick Barnhardt Gayle Moore Pete Boone Steve Kendrick Proposal Highligh

文档评论(0)

dajuhyy + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档