现代物流学第八章PPT.ppt

  1. 1、本文档共31页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
现代物流学第八章PPT

Supply Chain Logistics Management Chapter 13: Warehousing TYPE OF NEED Turn inventory Promotional inventory Speculative inventory Custom services and activities Seasonal NEW WAREHOUSES WILL BE: PRODUCT CHARACTERISTICS Handling characteristics Storage characteristics Speed of movement Flexibility ECONOMIC BENEFITS OF WAREHOUSING Consolidation Break-bulk Assortment Cross docking Mixing Assembly WAREHOUSE BENEFITS CONSOLIDATION WAREHOUSE BENEFIT BREAK BULK OPERATION WAREHOUSE BENEFIT Cross Dock TRADITIONAL HANDLING Palletizing, put away, storage, replenishment, selection and loading for shipment Food industry products handled up to 17 times in SC and in DC 4.3 times CROSS-DOCKING Products received, selected, repackaged, loaded for shipment storage Enabled by conveyors sortation equipment Used with general merchandise food Fast moving products replenished using POS systems Used in large (800K to 1,200K sq.ft..) DCs C-D Results Inventory carrying costs Storage processing space Product handling(damage, shrinkage, out of date products, returns, DC labor costs Improved sales through displays Logistics savings to product sales support STUDY OF C-D IN INDUSTRY Only 76% space of traditional Only 57% of direct labor Case/hour increases Up to 75% Excellent payback periods WAREHOUSING BENEFITS IN-TRANSIT MIXING WAREHOUSING BENEFITS MANUFACTURING SUPPORT SERVICE BENEFITS OF WAREHOUSING Spot stock (定点储存) Full line stocking(全产品线存储) Value-added service (增值服务) WAREHOUSING ALTERNATIVES Options Private Public Contract Other Select warehousing option with best strategic fit SHARE OF WAREHOUSE BUSINESS DECISION FACTORS Strategy Type of need Information system Control Product characteristics Culture STRATEGY Full line Centralized postponement Utilization of current capacity and resources Segment focused DIFFERENTIATION CONTRACT VS. PUBLIC Productivity sharing Business relationships Real estate arrangements Pricing agreements USE OF ALTERNATIVES (Percent of Faciliti

文档评论(0)

dajuhyy + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档