- 1、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程总承包合同英文
工程总承包合同英文 篇一:完整工程施工合同 英文版 Translation: Construction Contract Party A: (Developer) (Contractor) This contract is signed by the two Parties Party A and Party B according to the Contract Law of the People’s Republic of China, the Contraction law of the People抯 Republic of China , and other relevant national laws and regulations, as well as the specific nature of this project. On the basis of honesty and credit, equality, voluntariness, party A and party B have reached consensus through negotiations and signed this contract. 1. Project Introduction 1.1 1.2 1.3 1.4 The design of construction drawings: 2. Nature of Contracting 3. Construction period (including reception time after completion),and including the beginning date and completion date. 4. Quality of Project 5. Contract Amount 5.1 5.2 6. Final Audit of the project 6.1 The condition and steps for Party A pay the project funds to Party B: 6.2 6.3 Party B shall submit to Party A equivalent invoice before Party A抯 each period payment, otherwise, Party A can refuse to pay until the receiving of the Party B抯 invoice. 6.4 The invoice provided by Party B should be valid. Any falls invoice provided by Party B which are found by relevant office, the Party B should not only provide the valid invoice to Party A, but also bear the responsible caused by the invalid invoice. 7.Variation of design and visa 7.1During the process of the project, any contract list, technology checking list ( not include the variation, addition, substitution, and reduction on the drawings and project fee) concerning about this project shall only be regarded as effective with the confirmation of the representative Party A in writing. 7.2 Any variation notice list, technology checking list, contract list, technology checking list ( include the drawings design) concerning about this project shall only be regarded as effective with the confirmation of the seal of Party A. 7.3In the event of Party B fails to
您可能关注的文档
最近下载
- 中储粮油脂有限公司2025年下半年招聘笔试模拟试题及答案解析.docx VIP
- 长庆低渗透油藏描述难点、主要做法及典型案例.pptx VIP
- 安徽省2024_2025学年高二化学上学期第一次月考试题.doc VIP
- 2025北京房山区区直部门和乡镇(街道)全日制临聘人员招聘37人笔试备考试题及答案解析.docx VIP
- 学校建筑结构设计计算书.doc VIP
- 《应用文写作》高职完整全套教学课件.pdf
- 【施工】劳动力计划安排.docx VIP
- 2025北京房山区区直部门和乡镇(街道)全日制临聘人员招聘补充考试备考题库及答案解析.docx VIP
- 2025年河北保定市莲池区招聘社区工作者80人备考练习试题及答案解析.docx VIP
- 2022-2023年药物制剂期末复习-药物制剂设备与车间工艺设计(药物制剂)考试全真模考卷9(附答案.docx VIP
文档评论(0)