2005年二级建造师《建设工程法规及相关知识 》真题和答案(选择题)(2005 level ii constructor construction engineering regulations and related knowledge questions and answers (choice questions)).doc
- 1、本文档共31页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2005年二级建造师《建设工程法规及相关知识 》真题和答案(选择题)(2005 level ii constructor construction engineering regulations and related knowledge questions and answers (choice questions))
2005年二级建造师《建设工程法规及相关知识 》真题和答案(选择题)(2005 level ii constructor construction engineering regulations and related knowledge questions and answers (choice questions))
2005 level ii constructor qualification examination
Construction engineering regulations and related knowledge
1. The single item (1 point, 60 points). Only one of the candidates in each question is the most suitable.
1. The registered administrative institution of the qualification of a secondary constructor is ().
A. Construction department or its authorized institution
B. personnel department or its authorized institution
C. Construction industry association
D. provincial construction administration department
2. The registered builder () shall cancel the registration of the registered builder.
A. Practising in two construction enterprises at the same time
B. a registered builder works in a number of positions in a company
C. not qualified for secondary constructor
D. Disengagement of construction management and related work posts for one year
3. In the legal relationship of the principal-agent, if the authorization is unclear and causes losses to the third party, ().
A. to be held solely by the agent
B. The agent is solely responsible
C. the agent and the agent shall be liable for compensation according to the agreement
D. The agent shall be liable to the third party, and the agent shall be jointly and severally liable
4, a certain construction enterprise and construction units on May 10, 1999, signed a construction contract, the contract, the construction unit should to pay all the payment before September 10, 2001, but the construction unit has not been paid by the agreement. Then, the lawsuit of the construction company is valid to ().
A. May 10, 2001 B. September 10, 2001
C. September 10, 2002 D. 10 September 2003
5. Property rights,
It refers to the right of the holder to possess, use, benefit and dispose of his or her property.
A. mortgage b. property c. lien d. right
6. The management rights of e
您可能关注的文档
- (万科)住宅设计统一技术措施(建筑)(Unified technical measures for residential design (construction)).doc
- (建筑工程)第1章3(Chapter 1, 3).doc
- (新版)收缩膜热收缩膜生产制备工艺及应用专利技术光盘((new) shrink film shrinkage film production preparation process and application of patented technology compact disc).doc
- -平面旋转LED点阵套件-电子制作(- plane rotating LED lattice kit - electronic production).doc
- 001世界十大宫殿(001 the world's ten palaces).doc
- 0.8QQ手挡驾驶全攻略(0.8 QQ hand in the driver overall strategy).doc
- 002机械挖土施工工艺(Construction technology of mechanical excavation).doc
- 002作图题(黄冈市物理中考题调考题汇编)(002 graph (a compilation of examination questions in the physics of huanggang)).doc
- 008年石家庄市第二十八中学初三年级一模考试(In 008 shijiazhuang no.28 middle school, the first third grade a module examination).doc
- 005机械回填土施工工艺(Construction technology of mechanical backfill soil).doc
文档评论(0)