2008年二级建造师《机电工程》真题及答案(2008 secondary architect electromechanical engineering the original and the answer).doc
- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2008年二级建造师《机电工程》真题及答案(2008 secondary architect electromechanical engineering the original and the answer)
2008年二级建造师《机电工程》真题及答案(2008 secondary architect electromechanical engineering the original and the answer)
Complete A 顎?technical clarificaiton records
B 顎?quality control data and documents shall be complete
C 顎?construction log integrity
D 顎?resources configuration record intact
39 顎?record project has a steam drum installation of the boiler heating surface installation, 顎?顎?record, economizer installation, etc.
A 顎?water wall cold drawn
B 顎?induced draft fan installed
C 顎?for pump installation
D 顎?deaerator installation
40 顎?boiler installation in case of electrical equipment on fire when 顎?顎?should first cut off power supply must not use 顎?顎?put out the fire.
A 顎?halogenated
B 顎?water
C 顎?ammonium phosphate powder
2 D 顎?carbon dioxide, multiple-choice 顎?顎?10 questions 2 points each. In each alternative 顎?to match 顎?idea has two or more than two
Theres at least one wrong term. Wrong to choose subject less scoring 顎?顎?顎?the selected each option 顎?0.5 points
Scene 顎?seven 顎?a installation company to undertake a gas power generation engineering project department according to the engineering characteristics 顎?顎?installation company created
Worker organization design 顎?顎?scheme regulations of 1000 m3 LPG spherical tank welding should be preheated before 顎?welding work completed junior
Line integral heat treatment 顎?the 顎?water filling experiment equipment installation and adjusting method to the amount of each group of shim 顎?to the regulations
Gas turbine rigid coupling alignment with a dial indicator measuring 顎?after completion of main steam pipe steam purging.
According to the scenario 顎?seven 顎?顎?answer the following questions 顎?
41 顎?gas turbine types of the rigid coupling 顎?顎?
A 顎?flange type
B 顎?sleeve
C 顎?friction type
D 顎?mesh type
E 顎?clip shell
42 顎?gas generator installation process 顎?in the equipment layout and foundation between each group of shim for 顎?顎?block.
A 顎?2
3 B 顎?
C 顎?4
D 顎?5
E 顎?6
43 顎?with large flow steam purging main steam pipe 顎?should b
您可能关注的文档
- (万科)住宅设计统一技术措施(建筑)(Unified technical measures for residential design (construction)).doc
- (建筑工程)第1章3(Chapter 1, 3).doc
- (新版)收缩膜热收缩膜生产制备工艺及应用专利技术光盘((new) shrink film shrinkage film production preparation process and application of patented technology compact disc).doc
- -平面旋转LED点阵套件-电子制作(- plane rotating LED lattice kit - electronic production).doc
- 001世界十大宫殿(001 the world's ten palaces).doc
- 0.8QQ手挡驾驶全攻略(0.8 QQ hand in the driver overall strategy).doc
- 002机械挖土施工工艺(Construction technology of mechanical excavation).doc
- 002作图题(黄冈市物理中考题调考题汇编)(002 graph (a compilation of examination questions in the physics of huanggang)).doc
- 008年石家庄市第二十八中学初三年级一模考试(In 008 shijiazhuang no.28 middle school, the first third grade a module examination).doc
- 005机械回填土施工工艺(Construction technology of mechanical backfill soil).doc
文档评论(0)