网站大量收购闲置独家精品文档,联系QQ:2885784924

2010安规a卷b(2010 a volume b).doc

  1. 1、本文档共31页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2010安规a卷b(2010 a volume b)

2010安规a卷b(2010 a volume b) Check only after the pressure has been reduced to below the working pressure. 4. The ban on the railing, pipeline, on the back wheel, safety hood or walking on the bearing in the operation of the equipment and sit, such as must sit in the line to work, security measures must be done. 5. When working on a ladder, the ladder is about 40 degrees from the ground. Staff must work on a ladder not less than one metre from the top of the ladder. 6. When blowing ash, it is forbidden to open the inspection hole to observe the combustion. 7. All staff should learn to touch the electric shock, asphyxiation first aid, cardiopulmonary resuscitation, and be familiar with first aid knowledge about burns, scald, trauma, and body poisoning. 8. It is forbidden to work in the coal bunker where the coal is stored. Before cleaning the coal bin, contact the operation monitor, and use the coal powder in the barn to release it. 9. The staff before entering the steam drum, maintenance and repair work, should check the temperature in the steam drum, head is generally not more than 50 ℃, and have good ventilation may be allowed to enter. Staff working in the steam drum shall rotate and rest according to the condition of the body. 10. When working on the tube of the heating surface, the iron plate should be covered and secured. When a man is on a ladder, he is forbidden to move the ladder. The scaffold should be equipped with a strong ladder for the staff to move up and down. 13. Before the steam turbine starts to overhaul, The valve shall be broken off with the steam pipe, the heating pipe and the extraction system, the valve shall be locked and the warning card shall be hung. Power valves should also be cut off and warning signs. The hydrophobic system should be reliably isolated. The person in charge of overhaul shall check the pressure of the steam pipe before allowing the staff to work. 14. Any indication on the electrical equipment shall not be moved by any othe

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档