2010年一级建造师市政公用工程真题及答案(2010 primary construction division municipal public works project and the answer)
2010年一级建造师市政公用工程真题及答案(2010 primary construction division municipal public works project and the answer)
2010 national level 1 construction teacher practice qualification examination paper
Municipal public works management and practice
One, single choice question
1. In the stable base of the road inorganic binding material, the two ash stable soil () is higher than calcareous soil.
A. Board property
B. Early strength
C. frost resistance
D. Shrinkage
[answer] C
2. The bearing layer in the pavement structure is ().
A. at the grass-roots level
B. upper layer
C. below
D. cushion layer
A. A b. A
3. After construction of normal concrete pavement has been completed and maintained, the pedestrian will be allowed to pass after the concrete reaches 40% of the strength of the design ().
A. the compressive
B. flexural
C. tensile
D. shear
[answer] B
4. The maximum earth pressure for the interaction between rigid retaining wall and soil is () earth pressure.
A. A stationary
B. the passive
C. balance
D. the initiative
[answer] B
When a precast pile is made, the hammer process should be adopted ().
A. Heavy hammer blow
sledgehammer
C. light hammer blow
D. Light hammer and low blow
[answer] B
6. When the design strength is the prestressed concrete continuous girder of C50, the strength of concrete should reach the minimum () MPa.
A. 35.0
B. 37.5
C. 40.0
D. 45.0
[answer] B
7. After the post-tensioning of prestressed tendons, the strength of the slurry used in the pulping of the channel is not required.
No less than () MPa.
15 A.
B. 20
30 C.
D. 35
[answer] C
8. The construction method should be used in the construction of multi-layer multi-span structural tunnel with the use of shotblasting.
A. Full section method
Step b. step
C. Single sidewall guide pit method
D. cylinder method
[answer] D
9. In the compensation of the following heating pipes, the natural compensation method is ().
A. Waveform compensator
B.Z compensator
C. Square compensator
D. Filling compensator
[answer] B
10. The
您可能关注的文档
- (万科)住宅设计统一技术措施(建筑)(Unified technical measures for residential design (construction)).doc
- (建筑工程)第1章3(Chapter 1, 3).doc
- (新版)收缩膜热收缩膜生产制备工艺及应用专利技术光盘((new) shrink film shrinkage film production preparation process and application of patented technology compact disc).doc
- -平面旋转LED点阵套件-电子制作(- plane rotating LED lattice kit - electronic production).doc
- 001世界十大宫殿(001 the world's ten palaces).doc
- 0.8QQ手挡驾驶全攻略(0.8 QQ hand in the driver overall strategy).doc
- 002机械挖土施工工艺(Construction technology of mechanical excavation).doc
- 002作图题(黄冈市物理中考题调考题汇编)(002 graph (a compilation of examination questions in the physics of huanggang)).doc
- 008年石家庄市第二十八中学初三年级一模考试(In 008 shijiazhuang no.28 middle school, the first third grade a module examination).doc
- 005机械回填土施工工艺(Construction technology of mechanical backfill soil).doc
- 2025年软考-中级软考-多媒体应用设计师考试历年真题常考点试题带答案4.docx
- 通用墨盒行业深度研究报告.docx
- 2025年软考-中级软考-多媒体应用设计师考试历年真题常考点试题带答案1.docx
- 小型颗粒机行业深度研究报告.docx
- 中国网点印刷吊带项目投资可行性研究报告.docx
- 2025年软考-中级软考-信息系统管理工程师考试历年真题常考点试题带答案5.docx
- 弹性拉带行业深度研究报告.docx
- 2025年软考-中级软考-信息系统监理师考试历年真题常考点试题带答案5.docx
- 2025年软考-中级软考-多媒体应用设计师考试历年真题常考点试题带答案4.docx
- 2025年软考-中级软考-信息系统监理师考试历年真题常考点试题带答案4.docx
文档评论(0)