网站大量收购闲置独家精品文档,联系QQ:2885784924

2010年一级建造师市政公用工程真题及答案(2010 primary construction division municipal public works project and the answer).doc

2010年一级建造师市政公用工程真题及答案(2010 primary construction division municipal public works project and the answer).doc

  1. 1、本文档共28页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2010年一级建造师市政公用工程真题及答案(2010 primary construction division municipal public works project and the answer)

2010年一级建造师市政公用工程真题及答案(2010 primary construction division municipal public works project and the answer) 2010 national level 1 construction teacher practice qualification examination paper Municipal public works management and practice One, single choice question 1. In the stable base of the road inorganic binding material, the two ash stable soil () is higher than calcareous soil. A. Board property B. Early strength C. frost resistance D. Shrinkage [answer] C 2. The bearing layer in the pavement structure is (). A. at the grass-roots level B. upper layer C. below D. cushion layer A. A b. A 3. After construction of normal concrete pavement has been completed and maintained, the pedestrian will be allowed to pass after the concrete reaches 40% of the strength of the design (). A. the compressive B. flexural C. tensile D. shear [answer] B 4. The maximum earth pressure for the interaction between rigid retaining wall and soil is () earth pressure. A. A stationary B. the passive C. balance D. the initiative [answer] B When a precast pile is made, the hammer process should be adopted (). A. Heavy hammer blow sledgehammer C. light hammer blow D. Light hammer and low blow [answer] B 6. When the design strength is the prestressed concrete continuous girder of C50, the strength of concrete should reach the minimum () MPa. A. 35.0 B. 37.5 C. 40.0 D. 45.0 [answer] B 7. After the post-tensioning of prestressed tendons, the strength of the slurry used in the pulping of the channel is not required. No less than () MPa. 15 A. B. 20 30 C. D. 35 [answer] C 8. The construction method should be used in the construction of multi-layer multi-span structural tunnel with the use of shotblasting. A. Full section method Step b. step C. Single sidewall guide pit method D. cylinder method [answer] D 9. In the compensation of the following heating pipes, the natural compensation method is (). A. Waveform compensator B.Z compensator C. Square compensator D. Filling compensator [answer] B 10. The

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档