2010年春期《高层建筑施工》课程期末考试试题(The final exam of high-rise building construction in spring 2010).doc
- 1、本文档共26页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2010年春期《高层建筑施工》课程期末考试试题(The final exam of high-rise building construction in spring 2010)
2010年春期《高层建筑施工》课程期末考试试题(The final exam of high-rise building construction in spring 2010)
The final exam question and exam question of the 2010 spring construction project
Author: old beam click rate: 976
The final exam of high-rise building construction in spring 2010
The final exam of high-rise building construction in spring 2010
(5 x 6 = 30)
Flow sand: when the underground water level is excavated, water is pumped in the pit, sometimes the ground of the bottom of the pit is flowing, the ground water is flowing, and the edge of the excavation cant be dug deep, the phenomenon is called flow sand.
Reverse construction method: taking the project of foundation pit enclosure wall and pile and load-bearing column as vertical bearing component, the main structure of the roof and floor as support system (when it is necessary to add temporary support), to the ground and underground structure construction, at the same time or underground structure of top-down construction method called reverse construction method.
Cast-in-place pile: it is the pile that is formed when the pile in the construction site is made into a hole first, and then the concrete is poured into the hole and the concrete is added.
Stress relaxation: when the material is under load, the constraint deformation is constant, and the structural constraint stress will gradually decrease over time. This phenomenon is called stress relaxation.
Concrete creep: under the long-term action of a certain load, concrete will produce plastic deformation that increases with time, which is called creep of concrete.
High altitude assembling method: steel frame with high altitude assembling method for installation, set-up assemble scaffolds first location in the design, and then put the rack component parts of a crane or block hanged herself to the location of the air, assembled on the scaffold.
Two fill-in-the-blanks (2 x 10 = 20)
1.
The pile is divided into piles and piles according to the method of construction.
2. The f
您可能关注的文档
- (万科)住宅设计统一技术措施(建筑)(Unified technical measures for residential design (construction)).doc
- (建筑工程)第1章3(Chapter 1, 3).doc
- (新版)收缩膜热收缩膜生产制备工艺及应用专利技术光盘((new) shrink film shrinkage film production preparation process and application of patented technology compact disc).doc
- -平面旋转LED点阵套件-电子制作(- plane rotating LED lattice kit - electronic production).doc
- 001世界十大宫殿(001 the world's ten palaces).doc
- 0.8QQ手挡驾驶全攻略(0.8 QQ hand in the driver overall strategy).doc
- 002机械挖土施工工艺(Construction technology of mechanical excavation).doc
- 002作图题(黄冈市物理中考题调考题汇编)(002 graph (a compilation of examination questions in the physics of huanggang)).doc
- 008年石家庄市第二十八中学初三年级一模考试(In 008 shijiazhuang no.28 middle school, the first third grade a module examination).doc
- 005机械回填土施工工艺(Construction technology of mechanical backfill soil).doc
文档评论(0)