网站大量收购闲置独家精品文档,联系QQ:2885784924

2010年春期《高层建筑施工》课程期末考试试题(The final exam of high-rise building construction in spring 2010).doc

2010年春期《高层建筑施工》课程期末考试试题(The final exam of high-rise building construction in spring 2010).doc

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2010年春期《高层建筑施工》课程期末考试试题(The final exam of high-rise building construction in spring 2010)

2010年春期《高层建筑施工》课程期末考试试题(The final exam of high-rise building construction in spring 2010) The final exam question and exam question of the 2010 spring construction project Author: old beam click rate: 976 The final exam of high-rise building construction in spring 2010 The final exam of high-rise building construction in spring 2010 (5 x 6 = 30) Flow sand: when the underground water level is excavated, water is pumped in the pit, sometimes the ground of the bottom of the pit is flowing, the ground water is flowing, and the edge of the excavation cant be dug deep, the phenomenon is called flow sand. Reverse construction method: taking the project of foundation pit enclosure wall and pile and load-bearing column as vertical bearing component, the main structure of the roof and floor as support system (when it is necessary to add temporary support), to the ground and underground structure construction, at the same time or underground structure of top-down construction method called reverse construction method. Cast-in-place pile: it is the pile that is formed when the pile in the construction site is made into a hole first, and then the concrete is poured into the hole and the concrete is added. Stress relaxation: when the material is under load, the constraint deformation is constant, and the structural constraint stress will gradually decrease over time. This phenomenon is called stress relaxation. Concrete creep: under the long-term action of a certain load, concrete will produce plastic deformation that increases with time, which is called creep of concrete. High altitude assembling method: steel frame with high altitude assembling method for installation, set-up assemble scaffolds first location in the design, and then put the rack component parts of a crane or block hanged herself to the location of the air, assembled on the scaffold. Two fill-in-the-blanks (2 x 10 = 20) 1. The pile is divided into piles and piles according to the method of construction. 2. The f

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档