2012年下学期期末考试发动机电控技术复习题(In 2012, the final examination of the final test engine will be reworked).doc
- 1、本文档共2页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2012年下学期期末考试发动机电控技术复习题(In 2012, the final examination of the final test engine will be reworked)
2012年下学期期末考试发动机电控技术复习题(In 2012, the final examination of the final test engine will be reworked)
Principle: Carmen vortex caused by changes in air density, affected by the signal generator to send the ultrasonic arrival of the receiver or become early or late, measured the phase difference, the use of amplifiers to form a rectangular wave, rectangular pulse frequency The frequency of the swing for the card door.
Detection: Turn the ignition switch to ON position, check the voltage between VC and E2 should be 5V, KS and E2 voltage should be 2 ~ 4V.
88. How does the hot air flowmeter work? How to complete self-cleaning effect? What about the maintenance process? What is the superiority of the hot film air flowmeter?
Working principle: RA, RB, RH, RK composition Whiston bridge circuit. (Hot wire resistance RH, temperature compensation resistor RK)
Air flow RH → RH temperature reduction → RH resistance decreases → bridge loss of balance → control circuit to increase the current flowing through RH to restore the RH resistance, the bridge rebalance → RA both ends of the voltage increase, this The voltage is the sensor signal of the hot air flow meter
Self-cleaning effect
After the engine is stopped, the microcomputer centralized control device automatically heats the hotline to about 1000 ° C and burns the dust attached to the hotline.
Circuit detection
Turn on the ignition switch, do not start the engine, measured E and D, E and C between the voltage for the battery voltage. B and C between the signal voltage engine work for 2 ~ 4V, the engine does not work for the 1.0 ~ 1.5V, F and D between the voltage, turn off the ignition switch, the voltage should be zero and after 5s jump on the students, after 1s In the back to zero, that self-cleaning signal is good.
您可能关注的文档
- (万科)住宅设计统一技术措施(建筑)(Unified technical measures for residential design (construction)).doc
- (建筑工程)第1章3(Chapter 1, 3).doc
- (新版)收缩膜热收缩膜生产制备工艺及应用专利技术光盘((new) shrink film shrinkage film production preparation process and application of patented technology compact disc).doc
- -平面旋转LED点阵套件-电子制作(- plane rotating LED lattice kit - electronic production).doc
- 001世界十大宫殿(001 the world's ten palaces).doc
- 0.8QQ手挡驾驶全攻略(0.8 QQ hand in the driver overall strategy).doc
- 002机械挖土施工工艺(Construction technology of mechanical excavation).doc
- 002作图题(黄冈市物理中考题调考题汇编)(002 graph (a compilation of examination questions in the physics of huanggang)).doc
- 008年石家庄市第二十八中学初三年级一模考试(In 008 shijiazhuang no.28 middle school, the first third grade a module examination).doc
- 005机械回填土施工工艺(Construction technology of mechanical backfill soil).doc
文档评论(0)